哈尔滨松花江公路大桥主桥结构模型试验研究

来源 :东北林业大学学报 | 被引量 : 0次 | 上传用户:beyondryo
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
一、前言 哈尔滨松花江公路大桥是我国公路建设的特大桥梁,全长1656m,其中主桥748m(59+7×90+59m),为九跨预应力混凝土连续箱梁,横截面采用矩形双箱、行车道宽19m、两侧人行道各宽2.5m、采用分箱悬浇,连成整体的施工方案。设计荷载为汽车超-20级,验算荷载挂-120。该桥设计计算时将二个分离的单箱简化为I形梁,引用荷载横向分布系数2.4,按平面杆系进行电算。我们受大桥指挥部的委托进行结构模型 I. Introduction Harbin Songhua River Highway Bridge is a huge bridge in China’s highway construction with a total length of 1656m, of which, the main bridge is 748m (59 + 7 × 90 + 59m), which is a nine-span prestressed concrete continuous box girder with a rectangular cross-section , Traffic lane width 19m, width of 2.5m on both sides of the sidewalks, using sub-tank hanging pouring, even into the overall construction program. Design load for the car super-20, checking load hanging -120. The design of the bridge will be two separate single box simplified I-beam, the reference load horizontal distribution coefficient of 2.4, calculated by the plane rod system. We are entrusted by the headquarters of the bridge structure model
其他文献
从赤水回来,坐的还是长途汽车,因车胎先后爆了5次,这不到500公里的路便坐了快24个小时。当然,深刻的印象不只是坐车,林林总总的竹笋,两亿年前与恐龙同时代的珍稀孑遗植物桫椤、新型
会议
会议
根据我国民诉法司法解释第二百零八条第三款之规定,对于原告自始不正当(不适格)但是已经进入审判阶段的案件应驳回起诉.这种立法存在浪费诉讼资源及忽视当事人诉讼权利的明显