论文部分内容阅读
一、工程索赔的概念工程索赔通常是指在建设工程项目合同履行过程中,合同当事人一方因对方不履行或未能正确履行合同或者由于其他非自身因素而受到经济损失或权利损害,通过合同规定的程序向对方提出经济或时间补偿要求的行为。工程索赔是建设项目工程承包中经常发生的正常现象,由于施工现场条件、气象条件的变化,施工进度、物价的变化,以及合同条款、规范、标准文件和施工图纸的变更、差异、延误等因素的影响,使得工程承包合同执行过程中不可避
First, the concept of engineering claims Engineering claims usually refers to the process of construction projects in the contract performance, the parties to the contract because of the other party fails to perform or failed to properly perform the contract or due to other non-self-economic losses suffered by the right or damage, through the contract Procedure to the other party economic or time compensation requirements of the act. Engineering compensation is a normal phenomenon often occurred in construction project contracting. Due to construction site conditions, meteorological conditions, construction progress, price changes, as well as changes, differences, delays and other factors of contract terms, specifications, standard documents and construction drawings The impact of construction contracts makes the contract inevitable