【摘要】自从建国以来,我国在境内修建大批水电站、泵站、水闸、水库等水利水电工程,取得了良好的社会效益和经济效益。加强水利工程中的机电设备管理工作对于提高水电工程的效益有着非常重要的作用,只有保证了安装与保养的质量及操作安全,才能确保工程的效益。
【关键词】水利工程,机电设备,运行,管理
【Abstract】Ever since that time found a nation, our country at inshore build large quantity water electricity station, pump station, floodgate, reservoir etc. water conservancy water electrician's distance, obtain good of society performance and economy performance.Strengthen machine within marine hydraulic engineering electricity equipments management work for exaltation water electrician's distance of the performance have a count for much function and onlied have assurance install with maintain of quality and operation safety, then can insure the performance of engineering.
【Key words】Marine hydraulic engineering, the machine electricity equipments, circulate, management
在水利工程项目施工过程中,机电设备安装与土建施工的协调配合问题,直接影响着机电设备安装项目的实施进度和施工质量,甚至对整个水利工程项目的施工管理具有重要的影响,也在较大程度上对水闸、泵站、机组设备等水利设备的正常、安全运行产生影响,并直接影响到整个水利工程项目投资成本和项目功能产生的经济效益和社会效益。加強机电设备管理,保证机械设备能够正常运转并保持良好的运行状态,是保证工程顺利进行的基本条件。
1 水利工程中的机电设备安装易出现的问题与解决办法
1.1准备阶段协调配合的必要性
在对工程项目进行设计的阶段,需要请机电安装方面专业性强的设计人员进行设计,并对土建结构设计提出自己的技术要求,如:穿墙管道预埋、主机组地脚螺栓的孔洞预留、电气设备和线路的固定件预埋、通风设备构件预留及电缆孔洞预留等。在技术上比较细致的要求务必要在土建结构图中清晰反映出来。在水利工程设计上需要专业的人员,机电安装工人也要有一定的土建基础知识,这样才能看懂结构预留孔洞图等施工图纸,对土建施工计划和施工进度有一定的了解。
1.2与土建施工方案及其相关人员的协调配合
有时,土建与安装的施工方案会相互矛盾,相互制约。如安装调试主机的过程中要求一个安静清洁的工作条件,而土建往往交叉进行室内外装饰工程施工、工程机械作业;土建在进行砼浇筑时与安装进行的预埋部件、预留孔洞要求位置准确,以及在立模、振捣等工序中又会存在着使预埋预留位置偏移等矛盾,这就要求土建与安装在拟定他们各自施工方案的同时,要与施工人员进行交流,尽量对施工环境和施工要求进行细致的考虑,需要双方对彼此的内容和程序要了解和熟悉,在土建和施工中相互协调配合的基础上,才能尽量缩短施工的工期,更有效地顺利完成工程。
1.3基础工程施工阶段的协调配合
当到了基础工程施工阶段,需要机电安装专业的施工人员积极配合土建工作,如在防雷接地的预埋、电缆管及辅机进出水管道的预埋、大型机电设备安装所需吊环的预埋等方面都需要施工人员为土建工作人员做好及时的准备。还应随着土建的开展进度,尽量提前做好准备工作,例如,管道支架、电缆支架、电缆桥架等预埋件等工作,就应在土建封模前安装齐全。
1.4交叉施工的协调配合
水利工程是非常艰巨而又浩大的工程,这是由于水利水电工程多是年前或汛后开始施工所引起的。一般要求在汛前完成主体施工,因此,工作量很大,而且工期短,这就需要土建与安装两个部分都要加班加点,争取时间来保证工期,所以两个部分的交叉施工作业更是不可避免。遇到这种情况,应把防洪(潮)挡水的结构放在首位,这样,工作时间和人力都会有所降低。但是交叉工程难免会出现一些问题,当遇到工种交叉作业需要牺牲一定工期时,就需要项目经理或者业主来进行协调和安排。不同的工作状态需要不同的作业条件,甚至会有些苛刻。例如,机组安装时就要求场地的空间要大,要干净,有时还要求无灰尘等。
特殊条件(主机组安装时),安静无风(机组校核同心时),而这些条件都是与土建施工相互冲突的,会影响到对设备的安装,这个时候就需要牺牲一下土建工作的时间来尽量配合施工人员的工作。
2 机电设备运行中容易出现的问题及解决方法
2.1组合轴承漏油
若发电机运行中发现其内部有油雾严重,这样的故障出现原因可能是在组合上有一些不妥之处。我们可以就这个问题进行一下研究,当轴承端盖因密封不当而造成电机渗油,就会使发电机大轴与连接螺栓的密封圈没能起到一定的作用,以致油会顺螺纹流出。这种问题的出现,可以通过以下措施来进行改进:在大轴法兰与镜板的连接螺栓这两个部位之间加一个铜垫止漏,用此铜垫来代替轴承端盖,确保油不能从螺纹中流出。经过了一系列实践证明,这种处理方法确实能够对轴承漏油问题有很有效的作用。 2.2定子引出线电缆外表皮破裂
在产品质量上也会出现很多问题,如定子引出线电缆多处出现纵向表皮破裂,面对这种现象,可以采取临时包扎的辦法,在电缆支架上加一块橡皮用来作为垫片,这样的简单操作可以避免进一步损坏而形成两点胶合,在工作之后再将其逐一更换。
2.3定子转动引起温升过高
当电机在运行过程中,电机在承受其额定的载荷,有时候会发生温度过高的现象,这是在定子转动中不可忽视的问题,这时就需要将风道进行封闭并将冷却风机的风扇叶片角度进行一定调整,同时,把风机马达的容量适当加大,转动的定子温度便会明显降低,解决了在实际施工中由于温度过高而造成的各种问题。
2.4大轴位移过大
在水轮发电机组运行的过程中,因受水的推力作用,轴承的支撑件由于刚度不够而造成变形,使机组转动部分沿下游方向产生比较大的轴向位移,使运行中的发电机转子制动环与制动夹钳碰刮,轴承盖碰刮水导轴承,平面密封环与主轴密封转动环之间出现一些间隙而甩水等现象。面对这一情况,我们在管形座每块肋板上采用加焊支撑的办法进行改进,使轴向位移减小到安全范围,避免了甩水现象的发生。
3. 水利工程中机电设备安装施工优化管理
3.1机电设备安装与土建施工施工组织方案的协调配合。通常情况下,土建施工与机电设备安装的施工组织方案之间会存在相互冲突和制约的现象,所以在水利工程项目机电设备安装施工过程前,拟定机电设备安装施工的具体组织方案时,其设计人员必须与土建主体结构施工组织设计人员进行充分交流与沟通,双方尽量对对方的施工技术要求和施工环境条件进行全面、细致的了解。在土建结构施工与机电设备安装施工相互协调配合的前提条件下,才可能大幅度缩短水利工程项目的施工周期,确保优质、高效地完成施工任务。
3.2基础工程施工阶段的协调配合。在水利工程项目基础工程项目施工阶段,机电设备安装施工的专业技术人员应该积极配合参与土建主体结构的施工管理与协调过程,如针对防雷接地装置的预埋布置,大直径电缆管线管道以及辅机进出水管道的预埋施工,大型机械设备托运、吊装所需的预埋部件等方面都需要机电设备安装专业的专职工程技术人员为土建主体结构的施工技术人员做好及时、准确的交代与协调。另外,还应随着土建主体工程的实施进度,提前做好机电设备安装的准备措施,如管道支架、电缆线路桥架等预埋部件的安装等,应全部在土建主体结构模板架设完成前准备完善。
3.3交叉施工的协调配合。水利工程项目的整个实施过程是一项技术非常复杂、数量艰巨浩大的施工任务,这是由于水利工程项目大多需要在年前汛后期或者前后汛前期间进行施工所导致的,不同分部、分项工程的交叉施工作业在所难免。但是,不同的施工工序需要不同的施工场地环境和技术条件,有时甚至是难于完全达到。实际安装过程中,还是尽量调整土建主体结构的施工时间,以尽量配合协调机电设备安装的施工。
4 结束语
在整个水利工程项目实施管理过程中,水利机电设备安装施工管理是重要的组成部分。其中,机电设备安装与土建施工的协调配合对整个水利工程项目的顺利实施也起着至关重要的作用,在一定程度上直接决定了整个水利工程项目是否能安全、持续运行。面对双方配合过程中产生的系列问题,需要不断在水利工程项目的施工管理实践中积累经验,准确判断机电设备安装实施方案的科学、合理性,为水利工程机电设备的正常安装和运行做好基础。
参考文献
[1]中华人民共和国国家发展和改革委员会.水电水利工程金属结构与机电设备安装安全技术规程[M].北京:中国电力出版社,2007.
[2]胡佩玉.水利设备及材料招标评标方法探讨[J].中国水利,2008,(6):38-40.
[3]姜巍.水利设备的远程诊断与维修[J].水利水电快报,2007,(24):30-32.
[4]寇松彬,喻虹.水利工程机电设备的质量管理刍议[J].中小企业管理与科技,2010,(25):37-37.
【关键词】水利工程,机电设备,运行,管理
【Abstract】Ever since that time found a nation, our country at inshore build large quantity water electricity station, pump station, floodgate, reservoir etc. water conservancy water electrician's distance, obtain good of society performance and economy performance.Strengthen machine within marine hydraulic engineering electricity equipments management work for exaltation water electrician's distance of the performance have a count for much function and onlied have assurance install with maintain of quality and operation safety, then can insure the performance of engineering.
【Key words】Marine hydraulic engineering, the machine electricity equipments, circulate, management
在水利工程项目施工过程中,机电设备安装与土建施工的协调配合问题,直接影响着机电设备安装项目的实施进度和施工质量,甚至对整个水利工程项目的施工管理具有重要的影响,也在较大程度上对水闸、泵站、机组设备等水利设备的正常、安全运行产生影响,并直接影响到整个水利工程项目投资成本和项目功能产生的经济效益和社会效益。加強机电设备管理,保证机械设备能够正常运转并保持良好的运行状态,是保证工程顺利进行的基本条件。
1 水利工程中的机电设备安装易出现的问题与解决办法
1.1准备阶段协调配合的必要性
在对工程项目进行设计的阶段,需要请机电安装方面专业性强的设计人员进行设计,并对土建结构设计提出自己的技术要求,如:穿墙管道预埋、主机组地脚螺栓的孔洞预留、电气设备和线路的固定件预埋、通风设备构件预留及电缆孔洞预留等。在技术上比较细致的要求务必要在土建结构图中清晰反映出来。在水利工程设计上需要专业的人员,机电安装工人也要有一定的土建基础知识,这样才能看懂结构预留孔洞图等施工图纸,对土建施工计划和施工进度有一定的了解。
1.2与土建施工方案及其相关人员的协调配合
有时,土建与安装的施工方案会相互矛盾,相互制约。如安装调试主机的过程中要求一个安静清洁的工作条件,而土建往往交叉进行室内外装饰工程施工、工程机械作业;土建在进行砼浇筑时与安装进行的预埋部件、预留孔洞要求位置准确,以及在立模、振捣等工序中又会存在着使预埋预留位置偏移等矛盾,这就要求土建与安装在拟定他们各自施工方案的同时,要与施工人员进行交流,尽量对施工环境和施工要求进行细致的考虑,需要双方对彼此的内容和程序要了解和熟悉,在土建和施工中相互协调配合的基础上,才能尽量缩短施工的工期,更有效地顺利完成工程。
1.3基础工程施工阶段的协调配合
当到了基础工程施工阶段,需要机电安装专业的施工人员积极配合土建工作,如在防雷接地的预埋、电缆管及辅机进出水管道的预埋、大型机电设备安装所需吊环的预埋等方面都需要施工人员为土建工作人员做好及时的准备。还应随着土建的开展进度,尽量提前做好准备工作,例如,管道支架、电缆支架、电缆桥架等预埋件等工作,就应在土建封模前安装齐全。
1.4交叉施工的协调配合
水利工程是非常艰巨而又浩大的工程,这是由于水利水电工程多是年前或汛后开始施工所引起的。一般要求在汛前完成主体施工,因此,工作量很大,而且工期短,这就需要土建与安装两个部分都要加班加点,争取时间来保证工期,所以两个部分的交叉施工作业更是不可避免。遇到这种情况,应把防洪(潮)挡水的结构放在首位,这样,工作时间和人力都会有所降低。但是交叉工程难免会出现一些问题,当遇到工种交叉作业需要牺牲一定工期时,就需要项目经理或者业主来进行协调和安排。不同的工作状态需要不同的作业条件,甚至会有些苛刻。例如,机组安装时就要求场地的空间要大,要干净,有时还要求无灰尘等。
特殊条件(主机组安装时),安静无风(机组校核同心时),而这些条件都是与土建施工相互冲突的,会影响到对设备的安装,这个时候就需要牺牲一下土建工作的时间来尽量配合施工人员的工作。
2 机电设备运行中容易出现的问题及解决方法
2.1组合轴承漏油
若发电机运行中发现其内部有油雾严重,这样的故障出现原因可能是在组合上有一些不妥之处。我们可以就这个问题进行一下研究,当轴承端盖因密封不当而造成电机渗油,就会使发电机大轴与连接螺栓的密封圈没能起到一定的作用,以致油会顺螺纹流出。这种问题的出现,可以通过以下措施来进行改进:在大轴法兰与镜板的连接螺栓这两个部位之间加一个铜垫止漏,用此铜垫来代替轴承端盖,确保油不能从螺纹中流出。经过了一系列实践证明,这种处理方法确实能够对轴承漏油问题有很有效的作用。 2.2定子引出线电缆外表皮破裂
在产品质量上也会出现很多问题,如定子引出线电缆多处出现纵向表皮破裂,面对这种现象,可以采取临时包扎的辦法,在电缆支架上加一块橡皮用来作为垫片,这样的简单操作可以避免进一步损坏而形成两点胶合,在工作之后再将其逐一更换。
2.3定子转动引起温升过高
当电机在运行过程中,电机在承受其额定的载荷,有时候会发生温度过高的现象,这是在定子转动中不可忽视的问题,这时就需要将风道进行封闭并将冷却风机的风扇叶片角度进行一定调整,同时,把风机马达的容量适当加大,转动的定子温度便会明显降低,解决了在实际施工中由于温度过高而造成的各种问题。
2.4大轴位移过大
在水轮发电机组运行的过程中,因受水的推力作用,轴承的支撑件由于刚度不够而造成变形,使机组转动部分沿下游方向产生比较大的轴向位移,使运行中的发电机转子制动环与制动夹钳碰刮,轴承盖碰刮水导轴承,平面密封环与主轴密封转动环之间出现一些间隙而甩水等现象。面对这一情况,我们在管形座每块肋板上采用加焊支撑的办法进行改进,使轴向位移减小到安全范围,避免了甩水现象的发生。
3. 水利工程中机电设备安装施工优化管理
3.1机电设备安装与土建施工施工组织方案的协调配合。通常情况下,土建施工与机电设备安装的施工组织方案之间会存在相互冲突和制约的现象,所以在水利工程项目机电设备安装施工过程前,拟定机电设备安装施工的具体组织方案时,其设计人员必须与土建主体结构施工组织设计人员进行充分交流与沟通,双方尽量对对方的施工技术要求和施工环境条件进行全面、细致的了解。在土建结构施工与机电设备安装施工相互协调配合的前提条件下,才可能大幅度缩短水利工程项目的施工周期,确保优质、高效地完成施工任务。
3.2基础工程施工阶段的协调配合。在水利工程项目基础工程项目施工阶段,机电设备安装施工的专业技术人员应该积极配合参与土建主体结构的施工管理与协调过程,如针对防雷接地装置的预埋布置,大直径电缆管线管道以及辅机进出水管道的预埋施工,大型机械设备托运、吊装所需的预埋部件等方面都需要机电设备安装专业的专职工程技术人员为土建主体结构的施工技术人员做好及时、准确的交代与协调。另外,还应随着土建主体工程的实施进度,提前做好机电设备安装的准备措施,如管道支架、电缆线路桥架等预埋部件的安装等,应全部在土建主体结构模板架设完成前准备完善。
3.3交叉施工的协调配合。水利工程项目的整个实施过程是一项技术非常复杂、数量艰巨浩大的施工任务,这是由于水利工程项目大多需要在年前汛后期或者前后汛前期间进行施工所导致的,不同分部、分项工程的交叉施工作业在所难免。但是,不同的施工工序需要不同的施工场地环境和技术条件,有时甚至是难于完全达到。实际安装过程中,还是尽量调整土建主体结构的施工时间,以尽量配合协调机电设备安装的施工。
4 结束语
在整个水利工程项目实施管理过程中,水利机电设备安装施工管理是重要的组成部分。其中,机电设备安装与土建施工的协调配合对整个水利工程项目的顺利实施也起着至关重要的作用,在一定程度上直接决定了整个水利工程项目是否能安全、持续运行。面对双方配合过程中产生的系列问题,需要不断在水利工程项目的施工管理实践中积累经验,准确判断机电设备安装实施方案的科学、合理性,为水利工程机电设备的正常安装和运行做好基础。
参考文献
[1]中华人民共和国国家发展和改革委员会.水电水利工程金属结构与机电设备安装安全技术规程[M].北京:中国电力出版社,2007.
[2]胡佩玉.水利设备及材料招标评标方法探讨[J].中国水利,2008,(6):38-40.
[3]姜巍.水利设备的远程诊断与维修[J].水利水电快报,2007,(24):30-32.
[4]寇松彬,喻虹.水利工程机电设备的质量管理刍议[J].中小企业管理与科技,2010,(25):37-37.