本文主要论述了漫湾电站5台250MW 水轮发电机组的现场安装调试经验和有关机组运行情况,对大型水轮发电机组的设计,制造和现场安装调试具有一定的参考价值。
This paper mainly discusses the on-site installation and commissioning experience of 5 sets of 250MW hydro-generating units in Manwan Hydropower Station and the operation status of the units concerned, which is of certain reference value to the design, manufacture and on-site installation and commissioning of large hydrogenerator units.