摘要 随着我国交通事业的不断发展,各地公路建设力度不断加大。建筑施工的技术要求也随着整个交通建设行业的需要不断提高。我国各地地形复杂,公路桥梁高墩台施工设计的选择也越来越多,如何做好公路桥梁高墩台施工工作,保证整体公路建设的质量和工期是各大施工单位的重点研究问题。本文对于公路桥梁高墩台施工进行了分析。
关键词:公路桥梁;高墩台;施工技术
With the development of transportation industry in our country, all highway construction is increasing continuously. The technical requirements for construction with the traffic construction industry needs to improve. Our country landform is complex, GaoDunTai highway bridge construction design choice more and more, how to do GaoDunTai highway bridge construction, to ensure that the whole highway construction quality and time limit for a project is the construction unit of the key problem. In this paper GaoDunTai highway bridge construction are analyzed.
Keywords: highway bridge; GaoDunTai; Construction technology
中圖分类号:U448.14文献标识码: A 文章编号:
近年来,我国经济不断发展,道路交通建设工作的投入和规模也在逐年扩大。整体公路桥梁建设技术在不断提高中,对于整体施工技术的改进也在不断进行中。桥梁建设是公路建设中的重要部分。我国地质结构复杂的情况,在山岭河流等地质复杂的区域,采用桥梁高墩台设计的工程非常多。桥梁高墩台施工的技术难度较高,对于施工人员要求较高,在施工过程中,存在空中作业,对于整个生产的安全管理要求也很高。我国公路桥梁高墩台施工技术主要有高墩台液压滑模和高墩台翻模两种方式,选择合理的施工方式,对高墩台施工进行全面的控制和掌握,提高整体质量,缩短工期和成本,保证安全生产和经济效益是施工单位研究的重要内容。
1对于公路桥梁高墩台施工特点的分析
公路桥梁高墩台施工中,高空作业情况十分常见。施工过程考虑施工的安全性,对于高墩混凝土浇灌高度较高,在4米到6米之间。因此,施工时间较长,致使整体施工周期加长。在整体施工的准备工作中,整体设备投入较大。由于施工中大多采用平行施工的方式,导致模板投入较高。同时,施工时需要配备吊车,并且施工范围较大和分散,所需吊车数量较多,增加了整体施工投入的成本。在整个工程过程中,工程资金的周转由于工期过长造成支付回笼困难。在施工过程中,浇筑时间较长,施工次数较多,工程计量工作不好开展,工程款项支付遇到困难,再加上整体资金投入较多,致使工程整体的资金周转压力很大。
2对于公路桥梁高墩台施工技术的选择和分析
目前我国公路施工中,高墩台技术施工的主要方式有两种,分别是高墩台翻模施工和高墩台液压滑模施工。高墩台翻模施工是较为传统的施工方式,这种施工方式将模板分为三层,通过人工方式进行分层安装。这种施工方式的特点是外观美观,易于控制垂直度,缺点是施工工期较长,整体成本较高。滑模施工是较为先进的施工方式,近年来被广泛的采用,整体的机械化程度较高,施工效率较高,整体投入较低。但是,滑模施工整体的垂直度控制上较为困难,不如翻模便于控制。在选区滑摸施工时,要对于施工的整体进行严格的控制,以便达到减少工期,降低施工成本的目的。
3高墩台液压滑模的施工技术
3.1液压滑模的施工顺序
在施工期做好施工准备,采用滑模技术需要根据图纸进行设计,合理布置内模、外模、吊架、平台等设施。在滑模准备工作时,对安放位置和相关设备进行细致的检查。检查完成后安装钢筋,然后进行混凝土浇筑,采用分层浇筑技术。在混凝土浇筑进行到一定程度时,根据混凝土硬度开始滑动,按照相应的距离循环滑动。在混凝土养生时候,用PVC管进行养生护理。在滑模时,对温度进行监控,做好相应记录,同时安排好交接工作。在遇到特殊情况时,如果不能继续施工,则注意避免混凝土凝结,同时注意继续施工时的混凝土裂缝处理。
3.2滑模施工中的注意事项
在滑模施工中,要按照《公路工程质量检验评定标准》对墩台相应参数进行核实,减少误差,将误差控制在0.2%以内。在滑模过程中,滑升相应的距离后要注意对参数进行测量,进行及时的更正。滑升中注意对墩台的偏扭进行控制,出现偏扭时进行及时纠正,防止弯曲现象。操作台的控制对于整体滑模工作来说非常重要,高水平的控制可以保证滑模施工的质量。操作平台的材料要合理摆放,保证混凝土浇筑的顺利进行,保持对施工的掌握,随时检查和测试。
4公路桥梁高墩台翻模施工技术
4.1技术原理
高墩台翻模施工是利用吊塔进行钢模吊控的技术,这种施工方式将工作平台用支架支撑,在利用吊塔将工作平台与模板进行提升操作,安排施工人员在平台夹层中进行施工操作。墩台模板使用大块钢模,每套三节,每节三米。除了在墩底一次浇筑9米,以后都按照三米九米进行交替施工,循环交替进行翻升。在第三节浇筑完成后,提升工作平台,对第一、二节模板进行拆卸,并安装到第三节上方,校正后进行混凝土浇筑,直到施工完成。
4.2施工步骤
高墩翻模的施工流程较为复杂,一般先进行施工准备,根据现场情况进行钢筋安装和绑扎,在组装翻模和安装作业平台。在安装作业平台时,注意进行作业安全的防火措施,安装相应安全防护系统,进行灌注混凝土工作,混凝土灌注中注意进行养护工作,保证混凝土施工质量。之后进行钢筋安装,提升工作平台,进行相应的拆卸和安装工作,直至操作到墩顶,整体翻模施工结束。
4.3翻模施工特点
高墩台翻模施工的工艺可以改善滑模爬模技术的缺点,同时又兼具其优点。在翻模具体作业当中,把作业平台和所用模板分开,形成不同的施工部分,对滑模连续性的问题进行了改善,对混凝土的质量控制水平得到了提高,对施工中具体问题的解决能力有所提高,有利于顺利完成爬模工作。在利用吊塔进行翻模时,整体工艺水平较为先进。在使用液压翻模技术时候,容易产生混凝土表面的裂缝,施工平台出现变形。而利用吊模施工可以确保施工平台的形状,对于混凝土表面的开裂问题可以及时控制与处理,保证整体施工的安全性。
4.4适用范围
此种施工技术适合于公路铁路等高墩大跨度的圆形、矩形施工,可以保证实心高墩,同时这种施工对于混凝土为主的工程构筑也有很大优势。此外,在施工场所狭小,不容易运输的施工中,采用这种施工技术也有积极的意义。
5整体施工的设备选择
在高墩台施工当中,设备的选择非常重要。如果桥是直线桥或弯度较小,同时桥头的地形也足够符合条件,那么安装揽索是最常用的方法。这种方法的覆盖面大、成本低、施工方便。在选择塔吊时,可根据塔吊的覆盖面进行合理的规划,保证对墩台的覆盖。如果是工程采用滑模施工,那么则可以直接利用工作平台。如果选择翻模,就需要搭设工作架。在混凝土材料运输中,根据现场情况选择用索吊或吊车运料,用混凝土泵运料时,要注意不要触碰到模板,避免模板的不稳定。
6高墩台施工过程中的安全控制
在高墩台施工过程中,要注意工程的安全。加强现场安全措施的建立,如挂安全网,人员按照规定佩戴安全带,做好安全防护措施,防止施工现场的人员和物体发生坠落现象。在施工设备的使用中,操作人员要按照相关流程进行操作,避免由于误操作带来的安全事故的发生。对施工现场的用电情况进行严格管理和控制,避免安全事故的发生。在施工现场注意现场环境对施工的影响,如果施工季节为雨季,则做好防洪工作。只有做好安全防护工作,才能保证施工安全正常的进行。
7结束语
两种施工方法各有利弊,如何选择恰当的施工方式,对于工程项目管理人员非常总要。在高墩台施工工作中,要合理选择施工技术方案,根据工程的具体情况合理规划,根据工程本身的成本预算等情况,制定科学合理的施工方案,对整体施工情况和进度做好管理工作。提高高墩台施工的质量,保证整体公路建设工程的安全、高效的完成,保证整体工程项目的经济效益。
参考文献
[1]张志峰.论高速公路桥梁高墩台施工方法及控制措施[J].科技情报开发与济,2007 (32)
[2]张修亭.孙毅,郑永胜.公路桥梁高墩台施工技术分析[J].中小企业管理与科技(下旬刊),2009 (05)
关键词:公路桥梁;高墩台;施工技术
With the development of transportation industry in our country, all highway construction is increasing continuously. The technical requirements for construction with the traffic construction industry needs to improve. Our country landform is complex, GaoDunTai highway bridge construction design choice more and more, how to do GaoDunTai highway bridge construction, to ensure that the whole highway construction quality and time limit for a project is the construction unit of the key problem. In this paper GaoDunTai highway bridge construction are analyzed.
Keywords: highway bridge; GaoDunTai; Construction technology
中圖分类号:U448.14文献标识码: A 文章编号:
近年来,我国经济不断发展,道路交通建设工作的投入和规模也在逐年扩大。整体公路桥梁建设技术在不断提高中,对于整体施工技术的改进也在不断进行中。桥梁建设是公路建设中的重要部分。我国地质结构复杂的情况,在山岭河流等地质复杂的区域,采用桥梁高墩台设计的工程非常多。桥梁高墩台施工的技术难度较高,对于施工人员要求较高,在施工过程中,存在空中作业,对于整个生产的安全管理要求也很高。我国公路桥梁高墩台施工技术主要有高墩台液压滑模和高墩台翻模两种方式,选择合理的施工方式,对高墩台施工进行全面的控制和掌握,提高整体质量,缩短工期和成本,保证安全生产和经济效益是施工单位研究的重要内容。
1对于公路桥梁高墩台施工特点的分析
公路桥梁高墩台施工中,高空作业情况十分常见。施工过程考虑施工的安全性,对于高墩混凝土浇灌高度较高,在4米到6米之间。因此,施工时间较长,致使整体施工周期加长。在整体施工的准备工作中,整体设备投入较大。由于施工中大多采用平行施工的方式,导致模板投入较高。同时,施工时需要配备吊车,并且施工范围较大和分散,所需吊车数量较多,增加了整体施工投入的成本。在整个工程过程中,工程资金的周转由于工期过长造成支付回笼困难。在施工过程中,浇筑时间较长,施工次数较多,工程计量工作不好开展,工程款项支付遇到困难,再加上整体资金投入较多,致使工程整体的资金周转压力很大。
2对于公路桥梁高墩台施工技术的选择和分析
目前我国公路施工中,高墩台技术施工的主要方式有两种,分别是高墩台翻模施工和高墩台液压滑模施工。高墩台翻模施工是较为传统的施工方式,这种施工方式将模板分为三层,通过人工方式进行分层安装。这种施工方式的特点是外观美观,易于控制垂直度,缺点是施工工期较长,整体成本较高。滑模施工是较为先进的施工方式,近年来被广泛的采用,整体的机械化程度较高,施工效率较高,整体投入较低。但是,滑模施工整体的垂直度控制上较为困难,不如翻模便于控制。在选区滑摸施工时,要对于施工的整体进行严格的控制,以便达到减少工期,降低施工成本的目的。
3高墩台液压滑模的施工技术
3.1液压滑模的施工顺序
在施工期做好施工准备,采用滑模技术需要根据图纸进行设计,合理布置内模、外模、吊架、平台等设施。在滑模准备工作时,对安放位置和相关设备进行细致的检查。检查完成后安装钢筋,然后进行混凝土浇筑,采用分层浇筑技术。在混凝土浇筑进行到一定程度时,根据混凝土硬度开始滑动,按照相应的距离循环滑动。在混凝土养生时候,用PVC管进行养生护理。在滑模时,对温度进行监控,做好相应记录,同时安排好交接工作。在遇到特殊情况时,如果不能继续施工,则注意避免混凝土凝结,同时注意继续施工时的混凝土裂缝处理。
3.2滑模施工中的注意事项
在滑模施工中,要按照《公路工程质量检验评定标准》对墩台相应参数进行核实,减少误差,将误差控制在0.2%以内。在滑模过程中,滑升相应的距离后要注意对参数进行测量,进行及时的更正。滑升中注意对墩台的偏扭进行控制,出现偏扭时进行及时纠正,防止弯曲现象。操作台的控制对于整体滑模工作来说非常重要,高水平的控制可以保证滑模施工的质量。操作平台的材料要合理摆放,保证混凝土浇筑的顺利进行,保持对施工的掌握,随时检查和测试。
4公路桥梁高墩台翻模施工技术
4.1技术原理
高墩台翻模施工是利用吊塔进行钢模吊控的技术,这种施工方式将工作平台用支架支撑,在利用吊塔将工作平台与模板进行提升操作,安排施工人员在平台夹层中进行施工操作。墩台模板使用大块钢模,每套三节,每节三米。除了在墩底一次浇筑9米,以后都按照三米九米进行交替施工,循环交替进行翻升。在第三节浇筑完成后,提升工作平台,对第一、二节模板进行拆卸,并安装到第三节上方,校正后进行混凝土浇筑,直到施工完成。
4.2施工步骤
高墩翻模的施工流程较为复杂,一般先进行施工准备,根据现场情况进行钢筋安装和绑扎,在组装翻模和安装作业平台。在安装作业平台时,注意进行作业安全的防火措施,安装相应安全防护系统,进行灌注混凝土工作,混凝土灌注中注意进行养护工作,保证混凝土施工质量。之后进行钢筋安装,提升工作平台,进行相应的拆卸和安装工作,直至操作到墩顶,整体翻模施工结束。
4.3翻模施工特点
高墩台翻模施工的工艺可以改善滑模爬模技术的缺点,同时又兼具其优点。在翻模具体作业当中,把作业平台和所用模板分开,形成不同的施工部分,对滑模连续性的问题进行了改善,对混凝土的质量控制水平得到了提高,对施工中具体问题的解决能力有所提高,有利于顺利完成爬模工作。在利用吊塔进行翻模时,整体工艺水平较为先进。在使用液压翻模技术时候,容易产生混凝土表面的裂缝,施工平台出现变形。而利用吊模施工可以确保施工平台的形状,对于混凝土表面的开裂问题可以及时控制与处理,保证整体施工的安全性。
4.4适用范围
此种施工技术适合于公路铁路等高墩大跨度的圆形、矩形施工,可以保证实心高墩,同时这种施工对于混凝土为主的工程构筑也有很大优势。此外,在施工场所狭小,不容易运输的施工中,采用这种施工技术也有积极的意义。
5整体施工的设备选择
在高墩台施工当中,设备的选择非常重要。如果桥是直线桥或弯度较小,同时桥头的地形也足够符合条件,那么安装揽索是最常用的方法。这种方法的覆盖面大、成本低、施工方便。在选择塔吊时,可根据塔吊的覆盖面进行合理的规划,保证对墩台的覆盖。如果是工程采用滑模施工,那么则可以直接利用工作平台。如果选择翻模,就需要搭设工作架。在混凝土材料运输中,根据现场情况选择用索吊或吊车运料,用混凝土泵运料时,要注意不要触碰到模板,避免模板的不稳定。
6高墩台施工过程中的安全控制
在高墩台施工过程中,要注意工程的安全。加强现场安全措施的建立,如挂安全网,人员按照规定佩戴安全带,做好安全防护措施,防止施工现场的人员和物体发生坠落现象。在施工设备的使用中,操作人员要按照相关流程进行操作,避免由于误操作带来的安全事故的发生。对施工现场的用电情况进行严格管理和控制,避免安全事故的发生。在施工现场注意现场环境对施工的影响,如果施工季节为雨季,则做好防洪工作。只有做好安全防护工作,才能保证施工安全正常的进行。
7结束语
两种施工方法各有利弊,如何选择恰当的施工方式,对于工程项目管理人员非常总要。在高墩台施工工作中,要合理选择施工技术方案,根据工程的具体情况合理规划,根据工程本身的成本预算等情况,制定科学合理的施工方案,对整体施工情况和进度做好管理工作。提高高墩台施工的质量,保证整体公路建设工程的安全、高效的完成,保证整体工程项目的经济效益。