论文部分内容阅读
会议由中国金属学会采矿学术委员会矿山系统工程学组主持,于今年3月15~22日在湘潭大学召开。来自冶金、煤炭、建材、化工等系统45个单位的90多名代表出席,对以下三方面的10个程序进行了审议。 建立矿体模型 马鞍山钢铁设计研究院于1979年用距离平方反比法,以BCY语言编写的矿床三维矿块模型程序,能拟合地质界限,可以根据不同边界品位计算模块和矿体
The meeting was hosted by the Mining Systems Engineering Group of the Mining and Metallurgy Commission of China Metallurgical Society and was held at Xiangtan University from March 15 to March 22 this year. More than 90 representatives from 45 units in the metallurgical, coal, building materials, chemical and other systems attended the meeting and reviewed 10 procedures in the following three aspects. Establishment of ore body model Maanshan Iron and Steel Design and Research Institute in 1979 by the inverse square distance method to BCY mineral deposits prepared by the three-dimensional model nugget program to fit the geological boundaries can be calculated according to different boundary grade modules and ore bodies