【摘 要】
:
The beam pulsing system project of 5SDH-2 tandem accelerator began in 2007. The system for beam pulsing including ion source, chopper, buncher and computer cont
【出 处】
:
Annual Report of China Institute of Atomic Energy
论文部分内容阅读
The beam pulsing system project of 5SDH-2 tandem accelerator began in 2007. The system for beam pulsing including ion source, chopper, buncher and computer control system was introduced from National Electrostatics Corporation in USA. After one year of installation and adjustment, the pulsing
The system for beam pulsing including ion source, chopper, buncher and computer control system was introduced from National Electrostatics Corporation in USA. After one year of installation and adjustment, the pulsing
其他文献
SECRAL and LECR3 can separately deliver ion beams with various energy for HIRFL at IMP.In 2009,LECR3 produced 13 kinds of ions,including 3 kinds of metal ions,f
For the RF system of CYCIAE-100, the electric field in the accelerating gap of the cavity serves to provide energy for the particle acceleration, and therefore
一、施工监理与工程管理按照国家现行有关规范施工并不存在什么困难,然而施工质量却常常达不到要求,如施工单位在施工中能对最薄弱的环节予以关注,予以加强,就能收到事半功倍
一、前言.煤矿安全工作是一种多因素、多环节、动态复杂的系统工程,是煤矿生产的“天字号”大事.如何从根本上搞好煤矿安全生产,建立本质型安全管理机制,不断延长安全生产周
针对近年来供暖系统中存在的水利平衡、系统补水,散热器选择等方面常见问题,进行分析,对供暖系统进行诊断和诊治,给出建议.
北京时间2014年6月13日,四年一度的世界杯在巴西里约热内卢再燃战火。6月12日至7月14日,北青航媒科技传播有限公司与北青网在北京首都机场和深圳宝安机场的LED超大屏幕同时推
一、工程概况该综合楼为七层砖混结构建筑物长19.55m,宽12m,建筑面积为1680m~2,建筑物总高度为21.94m,基础埋深2.1m,该工程于2000年5月初开始施工,6月末主体工程施工结束,8月
The energy loss of charged particles in the material can be described by Bethe-Bloch formula,but this formula only applies to the charged particle which is heav
HIRFL-CSR Operation Status Display System(shortcut HOSDS)is used to display the operation status of HIRFL-CSR. Everyone in Internet can know the operation state