论文部分内容阅读
1 关于总平面布置施工圖 工厂平面布置施工設計是配合建筑施工进度分区編制的,铁路、道路亦以施工的先后分別按线路提交施工圖。总布置方面的施工圖紙有兩張。第一張是根据車間建筑施工平面圖編制的車間施工位置圖,圖上粗线表示施工車間的平面图,注明四角坐标、室外标高及車間地板标高,还应表示出該車間附近的道路及建筑物;如果是根据施工圖繪,可用細綫繪出,不然就按技术設計用虛綫画出。这張圖是車間施工定位的根据,同时可使施工單位知道該車間周圍的情况。第二張圖是車間区域总平面施工圖。这張圖是某車間周圍地面組織的施工圖,是根据确定的車間平面圖,铁路、公路等的施工設計編
1 General layout work drawings The layout design of the factory floor layout is made in accordance with the construction progress zoning. The railways and roads are also submitted to the construction drawings according to the construction sequence. There are two construction drawings for the general layout. The first one is the workshop construction location drawing according to the floor plan of the workshop construction. The thick line on the drawing shows the floor plan of the construction workshop, indicating the four-corner coordinates, the outdoor elevation and the floor elevation of the workshop. It should also indicate the roads and buildings near the workshop. If it is based on the construction drawing, it can be drawn with a thin line, otherwise it will be drawn with a dashed line according to the technical design. This map is the basis for the positioning of the workshop construction and allows the construction unit to know the situation around the workshop. The second figure is a general plan for the workshop area. This figure is a construction drawing of the ground organization around a workshop. It is based on the determined floor plan, and the construction design of railways, highways, etc.