论文部分内容阅读
1 前言自1962年卡马拉厂开工以来,随着高炉生产的发展,米纳斯·吉拉斯钢铁公司的烧结技术也得到了发展。内容积885米~3的№1高炉,最初以块矿
1 Introduction Since the start of the Kamala plant in 1962, the sintering technology of Minas Gerais Steel Corporation has also been developed with the development of blast furnace production. The volume of 885 m ~ 3 blast furnace № 1, initially lump ore