论文部分内容阅读
克拉2井位于库车凹陷北部直线背斜带西段克拉苏构造东高点,于1998年5月底完钻。为了落实克拉2井区的天然气储量,决定对该井的14个层位进行试油,且全部在127mm套管内完成作业。利用现有的设备对该气井进行钻杆测试,获高产气层7层,日产气23×104~...
Karat 2 well is located in the eastern Kulasu tectonic anomaly in the western part of the linear anticline in the northern Kuqa sag and was drilled at the end of May 1998. In order to implement the natural gas reserves in the well Kela2, it was decided to test the oil in 14 layers of the well and all the work was completed in a 127mm casing. Utilize existing equipment to carry on the drill pipe test to this gas well, get 7 layers of high gas production, Nissan gas 23 * 104 ...