从项目的初步设计、详细设计两个阶段根据某炼油项目的中间原料罐区上下游各相关装置生产运行的不同工况,进行了转输泵不同配置方案的设计。
From the preliminary design and detailed design stages of the project, the design of different configuration schemes of the transfer pump was carried out according to the different working conditions of the production and operation of the relevant devices in the upstream and downstream of the raw material tank area of a refinery project.