随着市场经济的发展,综合评估法在项目招标评标中存在的缺陷日益明显。一般房屋建筑和市政基础设施工程施工招标宜采用经评审的最低投标价法评标。采用经评审的最低投标价法的招标项目,必须采用工程量清单的计价方式,多数评委应该具备造价工程师资格,并严格执行招标评标的程序。这是经评审的最低投标价法在评标定标中获得成功的重要条件。
With the development of market economy, the defects of the comprehensive evaluation method in bidding and bid evaluation of the project have become increasingly obvious. General housing construction and municipal infrastructure construction bidding should adopt the lowest bid evaluation method of evaluation. The bidding project adopting the lowest bidding price method that has been evaluated must adopt the valuation method of bill of quantities. Most judges should have the qualification of cost engineer and strictly implement the procedure of bidding and bidding. This is an important condition for the success of the bid evaluation in the evaluation of the lowest tender price method.