金堆城露天矿设计工作现代化取得进展

来源 :有色矿山 | 被引量 : 0次 | 上传用户:gw678
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
十年动乱使我院设计工作的水平踏步不前,与国际先进水平相比,差距被拉大了。为了设计工作现代化,不能不急起直追。七十年代国际上技术发展是相当快的十年,尤其是电子计算机技术的发展,使系统工程在矿业中的应用能在实际中推广,使矿山工作达到系统最优化的目标。我院采矿室与清华大学自动化系协作,以金堆城矿为对象,共同研究“系统工程在露天矿设计中的应用”这一专题,其主要内容初步拟定为: Ten years of turmoil in our hospital design work step by step, compared with the international advanced level, the gap has been widened. In order to design the work of modernization, can not be caught up in a hurry. In the 1970s, the technological development in the world was quite fast. In particular, the development of electronic computer technology enabled the systematic application of the project in mining to be promoted in practice so that the work of mining could achieve the goal of system optimization. Our institute cooperates with Department of Automation of Tsinghua University to study the topic of “Application of Systematic Engineering in Surface Mine Design” to Jinduicheng Mine. The main contents of the project are as follows:
其他文献
家庭金融作为微观金融的重要组成部分,正逐渐成为金融学的一个重要研究领域,其研究内容涵盖住房资产和金融财富、负债和信贷约束、收人和支出、社会保障和保险、代际转移支付
根据电力工业部科学技术委员会,电力工业部机械制造局(79)电技电字第304号文,在陕西省电业管理局的主持下,PZM1600/1380型平盘中速磨煤机高铬铸铁辊套及衬板鉴定会于一九七
一多年来我国金属矿山设计,基本上沿用苏联五十年代的一些设计原则和方法。金属露天矿多采用一次设计、一次建成的方案。因此出现了基建工程量大,基建投资大,建设周期长等问
益阳桃花江竹业发展有限公司组建于2005年,座落在省级工业园区——桃江经济开发区,注册资金2000万元,现已通过ISO 9001质量管理体系认证、ISO 14001环境管理体系认证和0HSAS1
丹江口水电站计算机监控系统投入运行由电力部南京自动化研究所和丹江口水电厂合作研制的SSJ-3021型水电站计算机监控系统是国内首次研制成功并投入运行的。最近,该科研成果
本文探讨了不同播种期与春大豆种子产量和质量的关系。结果表明 ,春播收获的大豆种子产量虽高 ,但种子发芽率和发芽势较低、劣质种子百分率较高 ;采用秋季种植方式 ,可获得产
现场岩体弹性常数的测定,对于了解岩体的属性,探讨岩体破坏机理,有效地解决工程问题,具有十分重要的意义。但是这项工作即费时又费事,所用的工具一般比较笨重,测得的结果也
新兴的无纸贸易吕丽靳颖随着计算机的普及以及国际互联网络的飞速发展,无纸贸易(EDI)以其潜在的巨大优越性而愈来愈为人们所重视。据统计,实施EDI后,可以使商业文件的传输速度提高80%,文件成
进口名牌商品应向海关申报商标专利费吴瑕,柏雅琴最近,青岛海关在对一些企业进行常规稽查时发现,有一部分公司一般贸易项下进口的国外名牌服装、皮鞋等商品的商标专利费,在报关时
1956年7月1日以礼河锑级电站的第二级——水槽子水电站开工。水槽子电站装机容量1.75万kW,年发电量0.92亿 kWh,保证出力0.83万 kW。水库正常蓄水位2100m,混凝土溢流重力坝最