南京地铁1号线无线场强改造

来源 :现代城市轨道交通 | 被引量 : 0次 | 上传用户:wjran2008
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
南京地铁1号线无线系统采用EADS公司800M数字集群系统,由交换机、基站、直放站等设备组成,有地下漏缆和地面天线两种无线网络覆盖方式。经过运营使用一段时间后发现无线网络中存在弱场区和通话不良区域,造成越区切换通话中断,主要是覆盖设计不合理的问题。通过对网络原有漏缆覆盖方式优化改造,使场强覆盖达到-85dB以上(95%概率),改善了通话质量,为南京地铁1号线运营的顺畅沟通提供了良好的保障。 Nanjing Metro Line 1 wireless system uses EADS Corporation 800M digital trunking system, which is composed of switches, base stations, repeaters and other equipment. There are two kinds of wireless network coverage modes: underground leakage cable and ground antenna. After some period of operation and use, it is found that there is a weak field area and a poor call area in the wireless network, which results in interruption of the call of the handover and mainly covers problems of unreasonable design. By optimizing and revamping the existing overlay network of the network, the coverage of field strength reaches over -85dB (95% probability) and the call quality is improved, which provides a good guarantee for the smooth communication of Nanjing Metro Line 1 operation.
其他文献
日本HazamaAndo公司日前公布了以盾构土舱可视化为目标的加泥式土压平衡盾构的掘进实验成果.该成果证实,通过量测土舱内开挖土与舱壁等之间的剪切力,可以判断土体塑性流动状
简要介绍地铁无线通信系统,阐述旅客信息系统(PIS)的发展,分析目前存在的问题,提出将基于802.16e标准的全球微波接入互操作性(WiMAX)作为接入网技术引入地铁PIS系统。结合地
“分散修”维修模式是将整车检修任务分割成多项简单任务,每个检修项目根据运行天数、走行公里、甚至是零部件的工作时间或工作状态来决定,分开的检修项目安排在运输间休期间
针对杭州某地铁车站深基坑工程原承压水设计存在的问题,为减小施工风险,采用三维数值模拟与现场抽水试验相结合方法,提出适合本工程地层特性的承压水降压方案。研究表明:三维数值