论文部分内容阅读
文章主要介绍三峡工程永久船闸中六输水洞的开挖爆破对邻近的南六、北六闸首新浇混凝土影响的震动控制情况 ,并对爆破震动监测、成果分析及信息反馈等问题作了讨论
This paper mainly introduces the vibration control of the impact of the excavation blasting of the six water conveyance tunnels in the permanent ship lock of the Three Gorges Project on the newly poured concrete in the south of the South and the North Six gates and the blast monitoring of vibrations, analysis of results and information feedback discuss