2001年7月14日,黄委科技外事局组织有关专家对“黄河三花间致洪暴雨预报系统”项目进行验收。验收委员会认为:1.该项目立题切合黄河防洪减灾的紧迫需要,研究工作基础扎实,针对黄河三花间地区建立的各类模型结构合理,引进国内外先进技术,并有创新。由中尺度数值降水预报模式、
July 14, 2001, Science and Technology Commission of the Yellow Sea Science and Technology Bureau organized the relevant experts on the “Yellow River between three heavy rain caused by flood forecasting system,” the project for acceptance. Acceptance Committee believes that: 1. The project set the theme of the Yellow River flood control and disaster reduction in line with the urgent needs of solid foundation for research work, for the establishment of the Yellow River Sanhuajian various types of model structure is reasonable, the introduction of advanced technologies at home and abroad, and innovation. By the mesoscale numerical precipitation forecasting model,