柴河水库电厂装有 3台水轮发电机组 ,总容量70 30 k W,发电机出口电压为 6 .3k V,经 2台主变并入 6 6 k V国家电网 .电厂控制电源采用直流 110 V,由一组 GGF- 30 0型蓄电池供电 ;主变油开关及发电机油开关合闸电源采用直流 2 2 0 V,由一台 GKA型不可控硅整流装置供电 ,其交流侧
Chaihe Reservoir power plant equipped with three hydrogenerators, a total capacity of 7030kW, the generator outlet voltage of 6. 3k V, after two main transformers into the 6 6 k V National Grid. Power plant control power using DC 110 V, powered by a set of GGF-300 batteries; the main transformer oil switch and generator oil switch closing power supply using DC 220V, by a GKA uncontrolled rectifier rectifier power supply, the AC side