东西关水电厂引进自动化系统由电厂调试投运

来源 :水电厂自动化 | 被引量 : 0次 | 上传用户:KenBlove
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
东西关水电厂自动化系统从瑞典 ABB 公司引进,其中3、4号机组自动化部分在脱离 ABB 专家的情况下,由电厂自己调试,3号机于96年9月29日投运,4号机于同年12月12日投运,至此,电厂机组自动化系统已全部投运。电厂引进自动化系统设备主要包括:计算机监控系统,调速器电柜,励磁系统及自动化元件几个部分。计算机监控系统由 ABB Master 系统构成分布式结构,分为厂站级和现地级两层,厂站级包括 The automation system of Dongxiguan Hydropower Plant was introduced from ABB Company of Sweden. The automatic part of Unit 3 and Unit 4 was commissioned by the power plant without automation from ABB experts. The No.3 engine was put into operation on September 29, 1996 and the No.4 engine at December 12 the same year put into operation, so far, power plant automation system has been fully operational. Power plant automation system equipment imported include: computer monitoring system, governor panels, excitation systems and automation components in several parts. Computer monitoring system consists of ABB Master system distributed structure, divided into two levels of plant level and local level, plant level includes