论文部分内容阅读
文章介绍了高水头多泥沙河流上的马鹿塘电站,在初步设计中选用的水轮机中拆检修方案,并对下拆及中下拆水轮机检修方案的优缺点进行了分析、对比。
This paper introduces the Malutang Hydropower Station on the high head and muddy river, analyzes and compares the advantages and disadvantages of the overhaul and overhaul turbine in the preliminary design.