摘要:随着社会发展,我国城市建设进入了高速发展时期,建设了众多的高层建筑。由于在工程施工中土建与给排水专业缺乏必要的配合,设计上不够完善、大量预留预埋洞口不准确等原因,容易造成打凿洞口等一些质量缺欠,这样既影响给排水工程施工质量和使用功能,又降低了建筑结构的承载力。给排水是建筑工程施工中不可缺少的组成部分,给排水工程施工的质量直接影响建筑物的使用。本文结合工作经验和对给排水施工项目的了解,对建筑给排水施工过程进行了详细探讨,并针对其施工过程中常见的问题提出了预防措施和处理方法。
关键词:给排水施工;控制;常见问题;预防措施
Abstract: with the development of society, our country city construction has entered a period of rapid development, the construction of numerous high-rise buildings. Because the civil engineering in engineering construction and the water supply and drainage lack the necessary coordination, design is not perfect, causes many embedded reserved hole is not accurate, easy to cause the drilled hole and some quality defects, which affect the quality of water supply and drainage construction and function, and reducing the low bearing capacity of building structure. Water supply and drainage construction is an indispensable part for quality, drainage engineering construction directly influence the use of buildings. In this paper, combining with the working experience and the water supply and drainage construction project, the building water supply and drainage construction process are discussed in detail, and the construction process of the common problems and puts forward the prevention measures and treatment method.
Keywords: water supply and drainage construction; control; common problem; prevention measures
中图分类号:S276文献标识码:A文章编号:2095-2104(2013)
随着我国国民经济建设的不断发展,各类居住小区大量涌现,使建筑给排水得到了迅猛发展,建筑给排水施工技术在建筑施工中所占比重也日益增加。因此要针对给排水施工过程进行严格的质量技术控制,预防质量问题的产生。
一、住宅楼给排水分部工程施工过程的施工流程
住宅楼给排水分部工程是建筑给排水工程的一部分,其施工流程和建筑的施工密切相关,按照施工进度,主要分为:预留孔洞和预埋套管—干管和立管的制作—支管和附件的制作—管道吹洗和实验—设备和卫生器具安装—金属管道的油漆和防腐等几个阶段。
二、建筑给排水施工过程控制
2.1预留孔洞和预埋套管阶段
在建筑结构开始施工到封顶期间,给排水分部工程的施工工作是对预留孔洞和预埋套管的控制。预留孔洞,是指管道穿越楼板处,为了防止以后在楼板上开洞会导致破坏建筑结构而在浇筑楼板混凝土时预留的孔洞。而在管道穿梁建筑物地下室的外墙时,仅预留孔洞是不行的,为了防止外墙渗漏,須预埋套管。如果管道需要穿过两个相邻建筑物的外墙时,为了防止建筑物之间沉降不均匀,需要安装柔性套管。虽然预留孔洞和预埋套管阶段的工作量不大,但是对后期的管道安装和整体建筑工程的质量具有重要意义。其要求如下:(1)必须注意和土建施工的密切配合,关注其施工进度;(2)套管制作必须符合施工规范和施工图集的要求;(3)预留孔洞和预埋套管的位置必须正确,固定牢靠,不能有遗漏;(4)在混凝土浇筑时,必须安排专人在场,以便发现问题及时处理。
2.2干管和立管的制作阶段
建筑结构在封顶后,土建施工单位开始进行墙面粉刷和地面找平,安装公司应注意和土建单位密切配合,开始进行给排水干管和立管的施工。这一阶段的施工工作包括:支吊架的制作安装、立管的制作的制作安装、干管的制作安装。这一阶段的质量控制要点主要有:(1)
管道制作特别是镀锌钢管的套丝质量要严格控制,管道连接口要严密;(2)立管安装前需吊垂线,保证钢管的垂直度;(3)管道安装牢固,支吊架的安装要符合规范要求;(4)塑料管道须安装伸缩节,排水立管上按照规范设置检查口;(5)管道井内的隐蔽管道隐蔽前须进行隐蔽验收,验收合格后方可隐蔽;(6)立管安装施工中断时,须做好上端口的掩盖,防止杂物进入。
2.3支管和附件的制作阶段
(1)支管的安装方式。给支管安装有暗装和明装两种方式。暗装管道需在砖墙或地面上开凿管沟,管道暗装验收后再用砂浆掩盖。明装的给水支管沿墙面铺设,需要在墙面上安装管卡。(2)这一阶段的阶段质量控制要点主要有:1)管道安装牢固,支吊架的安装、接口的插入深度要符合规范要求,以保证接口的严密性,2)支管送到用水点的位置、标高应符合规范要求,排水支管水流方向的坡度要按照设计要求,阀门安装时应将阀门关闭,以避免杂物进入,影响阀门严密性。
2.4管道吹洗和实验阶段
管道安装结束后应该进行管道的各项实验检查管道系统的严密性,给水系统的管道还应进行冲洗,以满足卫生要求。其试验内容包括:给水管道的压力试验、排水管道的灌水试验、排水管道的通球试验。
2.5设备和卫生器具安装阶段
设备和卫生器具安装须在管道吹洗和试验合格之后。设备和卫生器具安装放在施工过程的最后,其安装位置必须正确。
2.6金属管道的油漆和防腐阶段
这是施工的最后阶段。给水管道必须刷红丹防锈漆,金属支架须进行镀锌或刷防锈漆,埋地铺设的引入给水管是金属管材时,必须做防腐处理。
三、给排水施工中常见问题的预防
3.1 排水管道堵塞问题的预防
为了避免交叉施工中造成管道堵塞现象,在管道安装前,除应认真疏通管腔,清除杂物,合理按规范规定正确使用排水配件;安装管道时,应保证坡度,符合设计要求与规范规定及排水管口采用水泥砂浆封口等措施外,还必须采取如下多种技术措施以防止管道堵塞:由于建筑结构需要原因,当立管上设有乙字管时,应根据规范要求,在乙字管的上部设检查口以便于检修; 当设计无要求时,应按施工及验收规范规定,在连接2个及2个以上大便器或3个及3个以上卫生器具的污水横管设置清扫口, 在转角小于135度的污水横管上,设置检查口或清扫口; 排水管道安装时,埋地排出管与立管暂不连接,在立管检查口管插端用托板或其他方法支牢,并及时补好立管穿二层的楼板洞,待确认立管固定可靠后,拆除临时支撑物,此管口应尽量避免土建施工时作为临时污水排出口。在土建装修基本结束后,给水明敷用直通套(管)筒将检查口管与底层排出管连接。
3.2管道渗漏问题的预防
管道渗漏问题也是给排水管道施工常见的问题,对于各批次的管材、管件的使用情况做好记录,一旦发现问题及时更换。对于PPR管材安装,应对其的伸缩性采取措施进行预防。可利用的技术措施有:非直埋管道敷设时,应考虑解决管道热胀冷缩变形的技术措施。应尽量利用管道折角自由臂补偿管道的伸缩;当管道不能利用折角作自然补偿时,应采用其他类型补偿措施。水平干管与水平支管连接、 水平干管与立管连接、立管和每层支管连接, 应有管道伸缩时相互不受影响的补偿措施。布置横管或立管时应充分利用建筑空间,以“U”形管道做变形补偿。出现渗漏问题,需要寻找漏水点,找到漏水点后分析原因。然后,采取相关措施进行处理:更换不合格的管材、管件;施工操作不合格的一律返工,重新制作安装;由于热胀冷缩造成的PPR管材,截去一段管道采取上述的技术措施进行整改。
3.3 阀门的选择和安装中问题的预防
安装时应考虑操作和维修空间,注意安装高度和手柄朝向;又如两个阀门直接连接时,中间缺少穿入螺栓的间隙,应在二阀间增设短管等止回阀必须按指示箭头安装。高位水箱出水管的止回阀,应在距水箱底≥1m处水平安装,以利止回阀正确动作,或采用低阻力止回阀。
3.4 噪音问题预防
防治措施有适当加大管径、采用曲挠橡胶接头、支架与管道接触处加橡胶垫以及加装减压阀等。但注意减压阀本身也有噪音,要经反复调试,使噪音减至最小。
建筑给排水工程与人们的生活密切相关, 研究如何避免给排水施工中容易出现的问题是很有必要的。因此,在实际的建筑给排水工程施工中,应该严格按照规范、规程、标准操作,控制好给排水工程的施工质量。
总之,论文对当前建筑给排水施工中质量控制进行了简要的回顾,并对给排水系统施工过程中常见质量问题的产生原因和处理及预防措施进行了阐述,相信我国的建筑给排水施工水平达到一个新的台阶。
参考文献
[1]石忠东.浅谈建筑给排水工程施工[ J ].建筑科学,2008,(18):48
[2]唐国庆、冯玉权.建筑给排水施工常见问题分析[J].视角,2008,(7):142.
[3]袁学锋.建筑给排水设计中节能与减噪音技术研究与探讨
关键词:给排水施工;控制;常见问题;预防措施
Abstract: with the development of society, our country city construction has entered a period of rapid development, the construction of numerous high-rise buildings. Because the civil engineering in engineering construction and the water supply and drainage lack the necessary coordination, design is not perfect, causes many embedded reserved hole is not accurate, easy to cause the drilled hole and some quality defects, which affect the quality of water supply and drainage construction and function, and reducing the low bearing capacity of building structure. Water supply and drainage construction is an indispensable part for quality, drainage engineering construction directly influence the use of buildings. In this paper, combining with the working experience and the water supply and drainage construction project, the building water supply and drainage construction process are discussed in detail, and the construction process of the common problems and puts forward the prevention measures and treatment method.
Keywords: water supply and drainage construction; control; common problem; prevention measures
中图分类号:S276文献标识码:A文章编号:2095-2104(2013)
随着我国国民经济建设的不断发展,各类居住小区大量涌现,使建筑给排水得到了迅猛发展,建筑给排水施工技术在建筑施工中所占比重也日益增加。因此要针对给排水施工过程进行严格的质量技术控制,预防质量问题的产生。
一、住宅楼给排水分部工程施工过程的施工流程
住宅楼给排水分部工程是建筑给排水工程的一部分,其施工流程和建筑的施工密切相关,按照施工进度,主要分为:预留孔洞和预埋套管—干管和立管的制作—支管和附件的制作—管道吹洗和实验—设备和卫生器具安装—金属管道的油漆和防腐等几个阶段。
二、建筑给排水施工过程控制
2.1预留孔洞和预埋套管阶段
在建筑结构开始施工到封顶期间,给排水分部工程的施工工作是对预留孔洞和预埋套管的控制。预留孔洞,是指管道穿越楼板处,为了防止以后在楼板上开洞会导致破坏建筑结构而在浇筑楼板混凝土时预留的孔洞。而在管道穿梁建筑物地下室的外墙时,仅预留孔洞是不行的,为了防止外墙渗漏,須预埋套管。如果管道需要穿过两个相邻建筑物的外墙时,为了防止建筑物之间沉降不均匀,需要安装柔性套管。虽然预留孔洞和预埋套管阶段的工作量不大,但是对后期的管道安装和整体建筑工程的质量具有重要意义。其要求如下:(1)必须注意和土建施工的密切配合,关注其施工进度;(2)套管制作必须符合施工规范和施工图集的要求;(3)预留孔洞和预埋套管的位置必须正确,固定牢靠,不能有遗漏;(4)在混凝土浇筑时,必须安排专人在场,以便发现问题及时处理。
2.2干管和立管的制作阶段
建筑结构在封顶后,土建施工单位开始进行墙面粉刷和地面找平,安装公司应注意和土建单位密切配合,开始进行给排水干管和立管的施工。这一阶段的施工工作包括:支吊架的制作安装、立管的制作的制作安装、干管的制作安装。这一阶段的质量控制要点主要有:(1)
管道制作特别是镀锌钢管的套丝质量要严格控制,管道连接口要严密;(2)立管安装前需吊垂线,保证钢管的垂直度;(3)管道安装牢固,支吊架的安装要符合规范要求;(4)塑料管道须安装伸缩节,排水立管上按照规范设置检查口;(5)管道井内的隐蔽管道隐蔽前须进行隐蔽验收,验收合格后方可隐蔽;(6)立管安装施工中断时,须做好上端口的掩盖,防止杂物进入。
2.3支管和附件的制作阶段
(1)支管的安装方式。给支管安装有暗装和明装两种方式。暗装管道需在砖墙或地面上开凿管沟,管道暗装验收后再用砂浆掩盖。明装的给水支管沿墙面铺设,需要在墙面上安装管卡。(2)这一阶段的阶段质量控制要点主要有:1)管道安装牢固,支吊架的安装、接口的插入深度要符合规范要求,以保证接口的严密性,2)支管送到用水点的位置、标高应符合规范要求,排水支管水流方向的坡度要按照设计要求,阀门安装时应将阀门关闭,以避免杂物进入,影响阀门严密性。
2.4管道吹洗和实验阶段
管道安装结束后应该进行管道的各项实验检查管道系统的严密性,给水系统的管道还应进行冲洗,以满足卫生要求。其试验内容包括:给水管道的压力试验、排水管道的灌水试验、排水管道的通球试验。
2.5设备和卫生器具安装阶段
设备和卫生器具安装须在管道吹洗和试验合格之后。设备和卫生器具安装放在施工过程的最后,其安装位置必须正确。
2.6金属管道的油漆和防腐阶段
这是施工的最后阶段。给水管道必须刷红丹防锈漆,金属支架须进行镀锌或刷防锈漆,埋地铺设的引入给水管是金属管材时,必须做防腐处理。
三、给排水施工中常见问题的预防
3.1 排水管道堵塞问题的预防
为了避免交叉施工中造成管道堵塞现象,在管道安装前,除应认真疏通管腔,清除杂物,合理按规范规定正确使用排水配件;安装管道时,应保证坡度,符合设计要求与规范规定及排水管口采用水泥砂浆封口等措施外,还必须采取如下多种技术措施以防止管道堵塞:由于建筑结构需要原因,当立管上设有乙字管时,应根据规范要求,在乙字管的上部设检查口以便于检修; 当设计无要求时,应按施工及验收规范规定,在连接2个及2个以上大便器或3个及3个以上卫生器具的污水横管设置清扫口, 在转角小于135度的污水横管上,设置检查口或清扫口; 排水管道安装时,埋地排出管与立管暂不连接,在立管检查口管插端用托板或其他方法支牢,并及时补好立管穿二层的楼板洞,待确认立管固定可靠后,拆除临时支撑物,此管口应尽量避免土建施工时作为临时污水排出口。在土建装修基本结束后,给水明敷用直通套(管)筒将检查口管与底层排出管连接。
3.2管道渗漏问题的预防
管道渗漏问题也是给排水管道施工常见的问题,对于各批次的管材、管件的使用情况做好记录,一旦发现问题及时更换。对于PPR管材安装,应对其的伸缩性采取措施进行预防。可利用的技术措施有:非直埋管道敷设时,应考虑解决管道热胀冷缩变形的技术措施。应尽量利用管道折角自由臂补偿管道的伸缩;当管道不能利用折角作自然补偿时,应采用其他类型补偿措施。水平干管与水平支管连接、 水平干管与立管连接、立管和每层支管连接, 应有管道伸缩时相互不受影响的补偿措施。布置横管或立管时应充分利用建筑空间,以“U”形管道做变形补偿。出现渗漏问题,需要寻找漏水点,找到漏水点后分析原因。然后,采取相关措施进行处理:更换不合格的管材、管件;施工操作不合格的一律返工,重新制作安装;由于热胀冷缩造成的PPR管材,截去一段管道采取上述的技术措施进行整改。
3.3 阀门的选择和安装中问题的预防
安装时应考虑操作和维修空间,注意安装高度和手柄朝向;又如两个阀门直接连接时,中间缺少穿入螺栓的间隙,应在二阀间增设短管等止回阀必须按指示箭头安装。高位水箱出水管的止回阀,应在距水箱底≥1m处水平安装,以利止回阀正确动作,或采用低阻力止回阀。
3.4 噪音问题预防
防治措施有适当加大管径、采用曲挠橡胶接头、支架与管道接触处加橡胶垫以及加装减压阀等。但注意减压阀本身也有噪音,要经反复调试,使噪音减至最小。
建筑给排水工程与人们的生活密切相关, 研究如何避免给排水施工中容易出现的问题是很有必要的。因此,在实际的建筑给排水工程施工中,应该严格按照规范、规程、标准操作,控制好给排水工程的施工质量。
总之,论文对当前建筑给排水施工中质量控制进行了简要的回顾,并对给排水系统施工过程中常见质量问题的产生原因和处理及预防措施进行了阐述,相信我国的建筑给排水施工水平达到一个新的台阶。