论文部分内容阅读
第六个五年計划內規定了規模宏偉的水电建設及在苏联若干地区內设计和建立强大的以水电为基础的电力系統。这要求我們以新的方式来提出并以新的方式来解决有关地区經济企業的規划和设計問題,以及有关地区綜合發展及生产宨T化規划的問題(这些地区內的大型水电站往往起着促进区化的作用)。为此,也必須重新来研討这些地区的技术政策,特別是推行新技术方面的問題。發出廉价电能的强大的水电站,不仅对地区的生产宨T化同时对一系列工業生产的工
The sixth five-year plan defines the ambitious hydropower construction and the design and establishment of a powerful hydropower-based power system in several regions of the Soviet Union. This requires us to propose in a new way and solve new problems in the planning and design of regional economic enterprises, as well as issues concerning the comprehensive development and production planning of the relevant regions. Large hydropower stations in these regions often play a role. Promote the role of districtization). To this end, it is also necessary to revisit the technical policies in these areas, in particular to promote new technologies. A powerful hydropower station that emits low-cost electricity, not only for the production of the area but also for a series of industrial production.