论文部分内容阅读
北京城北500kV变电站是第1批奥运电力配套工程。该工程在国内第1次采用容量最大、技术最先进的500 kV、l 200 MVA变压器,是华北电网第1座深入城市负荷中心500 kV变电站和第1座500 kV和220kV设备全部采用GIS的变电站。该项目的建设得到了北京市和国家电网公司的高度重视,项目设计、施工单位精心策划、周密部署,使该工程在同等规模电站的建设中工期最短并一次投运成功,被国家电网公司称为“国家电网公司样板工程”。本刊对该工程的设计、施工、管理等方面进行深入报道,以供业内同行借鉴。
Beijing North 500kV Substation is the first batch of Olympic power projects. The project is the first in China to adopt the largest and most technologically advanced 500 kV and 200 MVA transformers. It is the first substation in the North China Power Grid that is the first in-depth urban load center 500 kV substation and the first 500 kV and 220 kV equipment in all GIS stations . The construction of this project has been highly valued by Beijing Municipal Government and State Grid Corporation of China. The project design and construction units are well-planned and well-deployed so that the project will have the shortest duration and successful operation in the construction of the same-scale hydropower station. For the “National Grid Company Model Project.” Articles of the project design, construction, management and other aspects of in-depth coverage for the industry counterparts for reference.