论文部分内容阅读
槇文彦建筑设计事务所设计的麻省理工大学多媒体实验室综合大楼位于美国马萨诸塞州坎布里奇市,于2010年3月隆重开幕。这座建筑由于经济不景气拖延,施工耗时超过10年,成本高达9 000万美元,占地面积16.3万平方英尺的六层大楼,姿态优雅,号称麻省理工的E14,为俯瞰查尔斯河和波士顿天际线增添了一个最美丽的地标。
槇 Fumihiko architectural design firm MIT multimedia lab complex located in Cambridge, Massachusetts, United States, in March 2010 grand opening. Due to the economic downturn, the building took more than 10 years to build and cost as much as $ 90 million to cover a 163,000-square-foot six-story building with graceful elegance, known as the M14’s E14, overlooking the Charles River and Boston The skyline adds one of the most beautiful landmarks.