论文部分内容阅读
仪化公司化工厂认真抓好设备前期管理中的选型、验收、安装、试车等几个环节,在设备管理上取得了事半功倍的效果.我厂年产25万吨精对苯二甲酸(简称PTA)装置.采用美国AMOCO 90年代先进工艺,由意大利TPL公司承包建设.主装置技术先进、结构复杂、可靠性高,对前期管理提出了很高的要求.必须采用世界上先进的管理方法,严格质量控制,才能为长期、稳定、安全运行提供保障,为后阶段管理打下坚实的基础.一、把住选型关由于已同承包商确认了设备总报价,所以,我们可以在总报价范围内尽量择优选购技术先进,可靠性、维修性、节能性好的设备.从1991年开始,我们走访了扬子石
Yihua Chemical Factory earnestly did a good job in the selection, acceptance, installation, commissioning and other aspects of the pre-equipment management of equipment, and achieved a multiplier effect in equipment management. Our factory produces 250,000 tons of refined terephthalic acid per year (abbreviated as PTA) device. Adopted American AMOCO 90s advanced technology and contracted by Italian TPL company. The main device has advanced technology, complex structure and high reliability. It puts forward high requirements for previous management. It must adopt advanced management methods in the world. Strict quality control can provide guarantee for long-term, stable and safe operation. It lays a solid foundation for the later stage management. First, the selection of the type due to the confirmation of the total quotation of the equipment with the contractor, so we can in the total quotation range In the first place, we chose to purchase equipment that is technologically advanced, reliable, maintainable, and energy-efficient. Since 1991, we have visited Yangzi Stone.