论文部分内容阅读
龙潭电站220kV升压站建于特殊的狭窄地带,站区靠山坡侧堆石失稳,直接影响升压站安全运行,因此,在升压站土建工程施工时进行了堆石滑坡的治理情况。
The 220kV booster station of Longtan Power Station is built in a special narrow area. The rockfill side of the station area is not stable due to hillsides, which directly affects the safe operation of booster stations. Therefore, the management of rockfill landslides during construction of booster station civil works.