新兴铸管厂主储料场火车卸料平台支挡结构设计

来源 :勘察科学技术 | 被引量 : 0次 | 上传用户:allen_liliang
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
新兴铸管厂主储料场建于尾矿砂、碎石土堆填冲沟沟口宽敞地带,拟建火车卸料平台高差15.0m。鉴于平台填料工程地质、所处环境特征与支挡结构功能特点,经多种方案比较,采用了二级重力式组合挡墙、兼具铁路路基与卸料平台的综合设计,结构新颖,设计独特,成功地解决了支护、路基与卸料有机结合的复杂难题。为同类条件下的支护结构设计提供了有益的借鉴。 Xinxing Ductile Iron Piling Plant owners storage yard was built in the tailings sand, gravel soil fill the gully ditch spacious area, the proposed train unloading platform elevation 15.0m. In view of the platform packing engineering geology, the environment characteristics and the features of the support structure, the two-stage gravity combined retaining wall is adopted by a variety of schemes. It has the integrated design of railway subgrade and unloading platform with novel structure and unique design , Successfully solved the complicated problems of supporting, embankment and unloading combined organically. It provides a useful reference for the support structure design under the same conditions.
其他文献
武陵山片区的农村是集老(留守老人多)、少(留守儿童多)、边(地方偏僻)、穷(经济不发达)于一体的复杂社会群体,但也是特色产业蕴藏最丰富的地区。  随着“新农村”建设与“三农”服务