在党的十一届三中全会正确路线指引下,我县小水电迅速发展.到1984年底止,已投产电站的装机容量达29,427千瓦.其中并网的有25,065千瓦.全年发电量9,343万度.超额完成年电力生产计划18.7%.长期以来,我县电网通过大麻35KV变电站经明麻35KV线路与地区联网.由于线路长,导线截面小,导致其内35KV电网的电压高达40KV以上。
Under the correct guidance of the Third Plenary Session of the 11th CPC Central Committee, the rapid development of SHP in our county led to the installation of 29,427 kilowatts of hydropower plants by the end of 1984. Including 25,065 kilowatts of grid-connected power stations, the annual generating capacity of 93,343,000 Over 18.7% of the annual electricity production plan has been over-fulfilled. For a long time, our county’s power grid has been connected to the area via the 35KV marijuana 35KV substation because of its long line length and small conductor cross-section, resulting in the voltage of its 35KV power grid being over 40KV.