论文部分内容阅读
一、全省共七十七县,九千五百余乡,二千八百余万农村人口,去冬今春原定土改计划为三十五县,六千余乡,二千万人口,占全省的乡数与人口数的三分之二。整个土改过程,基本上是三个段落,自去年七月到十月是试验点,十一月到今年一月是第一批乡,二月到现在是第二第三批乡。截至三月底,完全结束者一四五六个乡,正在没收分配者二八一五个乡,统计春耕前可完成四二七一个乡,人口是一千四百六十万。为使运动深入正常发展,减少和避免偏差,特别是不误农时适时的转入春耕生产,在二月下旬,即主动的缩小了土改计划,原计划中剩下的一七○○个乡,决定春耕前不再铺开,结果是完成了原计划乡的百分之七十一,人口的百分之七十三,占全省乡与人口的一半。
First, the province has a total of 77 counties, 19,500 rural areas and 28 million rural population. In the winter and spring this year, the original soil improvement plan is 35 counties, 6,000 rural areas and 20 million population, accounting for The province’s rural population and the population of two-thirds. The whole process of land reform basically consists of three paragraphs. Since last July and October were the pilot sites, the first batch of townships were held in November this year in January of this year and the second batch of townships in the second from February to now. As of the end of March, a total of 1456 townships that are completely over are being confiscated from 2815 rural residents. Statistics show that 4,271 rural townships can be completed before spring planting, with a population of 14,600,000. In order to deepen the normal development of the movement, reduce and avoid deviations, especially when it is not a proper time for agriculture to turn into spring production, in late February, the initiative to reduce the scale of the land reform was adopted. The remaining 1,700 villages, The decision to stop rolling out before the spring plowing resulted in 71% of the original planned rural population and 73% of the population, accounting for half of the province’s population and population.