热网改造工程按其施工步骤可分为放线测量、管架砼基础浇筑及管架安装、管道安装、管线保温、管线试压、管网清洗、管网热态运行等几部分,每一部分都有其施工管理要点。 The heat network reconstruction project can be divided into several parts, such as line measurement, pipe racking, foundation pouring and pipe rack installation, pipe installation, pipeline insulation, pipeline pressure test, pipe network cleaning, pipe network hot running, etc., each part. Has its construction management points.
其他文献
Background According to the regulations of the Chinese and Shanghai governments, migrant workers employed in Shanghai should all be entitled to Shanghai Migrant
本文主要从隧道稳定性研究出发,以膨胀性围岩隧道为例,对浅埋大跨度隧道的合理施工技术进行研究 Based on the research of tunnel stability, taking the expansive surrou
An increase in atmospheric nitrogen (N) deposition can promote soil acidification,which may increase the release of ethylene (C2H4) under forest floors.Unfortun
Alfalfa cropping has been considered an efficient method of increasing soil fertility.Usually nitrogen increase in root nodules is considered to be the major be
Based on the environment characteristics of the Beibu Gulf of South China Sea,a quasi-three-dimensional physical model is built.By coupling the bottom boundary
针对神东矿区活鸡兔井在沟谷地形下工作面动载矿压灾害问题,通过力学分析和物理模拟实验,就沟谷地形的坡角对工作面动载矿压的影响进行了研究.结果表明:当工作面推进到覆岩主
Based on the drought/flood grades of 90 meterological stations over eastern China and summer average sea-level pressure (SLP) during 1850-2008 and BPCCA statist
2011设计周暨三年展于2011年9月26日至10月3日在北京举办。本届设计周及三年展邀请到伦敦.米兰.柏林、赫尔辛基,首尔五大知名设计周,节主席、英国知名设计师汤姆·迪克森,日本平面
Enhanced permeation and retention(EPR) targeting effect of rhodamine B labeled PEG-b-P(LA-co-DHP)[PEG:poly(ethylene glycol); LA:L-lactide; DHP:2,2-dihydroxylmet
In order to compensate for the deficiency of present methods of monitoring plane displacement in similarity model tests,such as inadequate real-time monitoring