论文部分内容阅读
山西省万家寨引黄一期工程中,在联接段整个输水线路上,间隔布置有7条输水隧洞,其中#1~#6隧洞长7989.9m,为圆形有压隧洞,采用洞穿PCCP管进行施工,如此长的PCCP洞穿管工程在国内尚属首例.PCCP即钢筒型预应力混凝土压力管,其基本结构是:在带有钢筒、内臂光滑的高强混凝土管芯上缠绕环向预应力钢丝,并在其上制作密实而耐久的富水泥砂浆保护层.设计采用常规钻爆法开挖、支护完成后,将PCCP管穿入洞中,管内径为3m,壁厚21.5cm,每节长5m.隧洞内PCCP管的安装顺序为:铺设轨道,洞外吊装PCCP管,洞内对接PCCP管,最后是回填混凝土和灌浆.
In Shanxi Wanjiazhai Yellow River Diversion Project, 7 water diversion tunnels are arranged on the entire water transmission line of the connecting section with 7989.9m long tunnels of # 1 ~ # 6, with circular pressure tunnels PCCP pipe construction, such a long PCCP hole through the pipe project is the first case in China.PCCP that is prestressed steel tube prestressed concrete pipe, the basic structure is: with a steel tube, the inner arm smooth high-strength concrete core Wrapped around the ring prestressed steel wire, and to make dense and durable cement-rich mortar protective layer on the design by conventional drilling and blasting excavation, support is completed, the PCCP pipe into the hole, the pipe diameter of 3m, the wall Thickness of 21.5cm, each section length of 5m. The installation of the tunnel PCCP pipe order: laying the track, hoisting PCCP pipe outside the hole, the hole docking PCCP pipe, and finally backfilled concrete and grouting.