在有轨电车施工阶段,通过制定统一的BIM建模标准、工作规范,同时采用构件三维数据模型,再通过统一的软件平台进行各专业模型的整合;基于统一的模型平台开展碰撞检查、设计优化、施工协调、进度模拟、三维算量和预制加工等各专业的应用。最后进一步探索了BIM和信息技术在有轨电车项目中对于进度、图档、质量、安全和合约等的四维、五维精细化管理。
In the stage of tram construction, the unified BIM modeling standards and work practices are adopted, and the three-dimensional data model of components is adopted at the same time, and the professional models are integrated through a unified software platform. Based on a unified model platform, collision check and design optimization , Construction coordination, progress simulation, three-dimensional calculation and prefabrication and other professional applications. Finally, further exploration of BIM and information technology in the tram project for the progress, file, quality, safety and contract, such as the four-dimensional, five-dimensional fine management.