地震对大坝和水库的影响

来源 :人民长江 | 被引量 : 0次 | 上传用户:KEN_LONG
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
据英国《顾问工程师》1978年5月号报道:要求坝址和水库地区完全避开断层几乎是不可能的。峡谷中的天然坝址一般因有垂直错位而形成岩石的弱点,所以多数的坝不得不跨建在断层上。如果这些断层带变成活动的,就会带来经常性的危险,在跨越断层处会发生连续的缓慢徐变,或者突然的相对位移。文章探讨了坝和水库可能产生的位移的各种影响,并以伊朗的拉尔工程为例,列出了在一个潜在的地震活动区对坝址规划需要考虑的各种因素。 According to the May 1978 issue of the British “Consulting Engineer,” it is almost impossible to require dam and reservoir areas to completely avoid faults. Natural dam sites in the canyon are generally rock-weak due to vertical dislocation, so most dams have to be built across the fault. If these fault zones become active, there is a recurring risk of continuous slow creep or abrupt relative displacement across the fault. In this paper, the various influences of possible displacements of dam and reservoirs are discussed. Taking Lal Project in Iran as an example, various factors that need to be considered in dam site planning in a potential seismic activity area are listed.
其他文献
在欧美,一个人平均每年消费两卷胶卷;在中国,平均10个人每年才消费一个胶卷,然而中国这个正在飞速发展的国家有12亿人口。因此,哪一个公司若忽略了中国市场,那他将是最大的傻
本文的主题思想是:利用围岩中的地应力,使隧洞衬砌受到预压应力,以减轻衬砌中的拉应力,并在理论上作了探索分析。这是一种有意义的设想。但这一设想还没有在实践中用过,也未
CJP型混凝土内部应变计主要用于混凝土建筑结构内部应变测量。本文将讨论“CJP”设计中考虑的主要问题、构造、技术经济特性、各种外界影响、及应用效果。实践表明:“CJP”体
三峡工程混凝土工程量达2000余万立米。本文从保证混凝土质量和降低混凝土造价的角度,探讨了四种较好的水泥方案:两种粗骨料方案、三种砂子方案及两种掺合料方案。文中对各方
本文应用有限单元逐步积分法,分析混凝土重力坝在爆炸冲击波荷载作用下的动力反应;对影响结构动力反应的有关参数的相互关系进行了研究计算。计算成果与试验值比较,其规律性
中国水利工程原型观测、室内测试仪器赴日考察团的技术考察报告将日本水利(土木)工程方面的科研概况作了比较详细的介绍。为了供我国的同行参考借鉴,本刊摘要刊登了原型观测
一九七六年七月卅一日大汤姆逊河峡谷处下了10英吋(250mm)的暴雨。根据美国地质调查部门间接测量结果,大汤姆逊河在哥罗里达州特拉克附近的峡谷口处的流量为31200cfs(870m~3
美国雷诺金属公司积极开发铝在汽车中的应用美国雷诺金属公司是世界第三大铝业公司,近3年各种产品的产量如下所列(kt):由于铝合金的重量轻、强度高、加工成形性能好与再生利用率高,是
一问题的提出洞庭湖区圩垸内的生产地面高程,汛期一般低于外江(外湖)水位,排水闸无抢排机会,其降雨所产生的涝水需用机械抽排和湖泊调蓄。六十年代以来,对这类排涝系统已按
新滩位于长江西陵峡上段——兵书宝剑峡出口处,属湖北省秭归县,下距宜昌72公里.在葛洲坝工程的水库范围内。长期以来,两岸岩崩、滑坡时有发生,不但影响当地居民安全,而且崩