上海某项目地铁上盖综合体贯通12,13号地铁车站,其地下空间结构与车站连成整体且不设缝。设计难点一方面在于办公塔楼紧邻地铁车站且局部裙楼直接坐落在地铁车站上方,需谨慎考虑上盖综合体对地铁车站的沉降影响;另一方面主体结构存在扭转不规则、抗侧力构件不连续、塔楼偏置等多项超限。详细介绍了地铁上盖综合体的结构体系,以及针对超限部分所采取的构造措施、基础设计、沉降控制及减小对地铁附加影响的措施。地铁的附加沉降对上部结构尤为敏感,应尽可能考虑减轻上部结构自重,优化结构布置;可通过合理的桩基布置,采取桩尖注浆等手段减小基础沉降,从而减轻对地铁的附加影响。
Shanghai Subway superstructure integrated project through the No. 12 and No. 13 metro stations, the underground space structure and the station linked into a whole and no seams. On the one hand, the design difficulties lie in that the office tower is close to the subway station and the partial podium is directly above the subway station. Careful consideration should be given to the settlement effect of the superstructure on the subway station; on the other hand, the main structure has irregular torsion, Continuous, tower offset and many other overrun. The structure system of the subway superstructure is introduced in detail, as well as the structural measures, basic design, settlement control and additional measures to reduce the additional impact on the subway. Subway subsidence is particularly sensitive to the superstructure. As far as possible, consideration should be given to reducing the self-weight of the superstructure and optimizing the structural arrangement. Substantial settlement can be reduced by using reasonable pile foundation layout and grouting to reduce the additional impact on the subway. .