东南汽车(二期)工程该项目为二期工程,拟扩征用土进行二期厂房建设,导入“轿车Ⅰ型”生产线。预计将新增产量3万辆/年东南商品车。项目总投资73414万元。工程于2003年开工,预计于2004年完工。所需主要设备为焊装车间:悬挂式焊机、装焊线;涂装车间:前处理线:总装车间:高架底盘输送机、车身内饰输送机。该项目由东南(福建)工业有限公司承担,负责人林国铭,联系电话为0591-2766566。设计单位为机械部第五设计研究院。现代结晶技术与机电一体化装置产业工程二期项目
South East Motor (Phase II) Project The project is a second phase project. It is planned to expand the use of soil for the second phase of plant construction and import the production line of “Type Ⅰ” for cars. It is estimated that a new production of 30,000 vehicles / year southeast commercial vehicles will be added. The total investment of 734.14 million yuan. The project started in 2003 and is expected to be completed in 2004. The main equipment required for the welding shop: hanging welder, installed welding line; Painting Workshop: Pre-treatment line: Assembly shop: elevated chassis conveyor, body interior conveyor. The project by the Southeast (Fujian) Industrial Co., Ltd. commitment, the person in charge of Lin Guoming, Tel 0591-2766566. The design unit for the Ministry of Machinery Fifth Design Institute. Modern crystallization technology and mechanical and electrical integration of industrial projects in the second phase project