施工现场管理,是取得工程质量、工期和消耗“最佳配搭”的基础,是构成企业信誉和效益的最直接最基本的要素。为了取得这种“最佳配搭”,多年来,在单位工程施工实践中,我们摸索和总结出了采用“二表、二卡、二单的方法(简称“三二控制法”),用以对单位工程的质量、工期和消耗实施预先控制和具体管理,使施工现场的每一个管理人员和操作工人都目标明确、职责分明,既心中有数,又责任落实,
Construction site management is the basis for obtaining the “best match” for project quality, construction period and consumption, and is the most direct and basic element that constitutes the company’s reputation and benefits. In order to achieve this “best match”, over the years, in the unit construction practice, we have explored and summed up the use of “two forms, two cards, two single methods (referred to as ”three two control method") to Pre-control and specific management of the quality, duration and consumption of the unit project shall be carried out so that every management and operation worker at the construction site has a clear goal, clear responsibilities, and is fully aware of the responsibilities.