【摘 要】
:
(一) 施工的特点和方法梅山水库工程主要的是钢筋混凝土结构的连拱坝,在施工过程中允许一定的流量漫溢坝身,坝址附近河谷狭隘,两岸山坡陡峭,河床复盖层厚达12°公尺,采用隧
论文部分内容阅读
(一) 施工的特点和方法梅山水库工程主要的是钢筋混凝土结构的连拱坝,在施工过程中允许一定的流量漫溢坝身,坝址附近河谷狭隘,两岸山坡陡峭,河床复盖层厚达12°公尺,采用隧洞导流和一期施工的方法,给工场布置很大的便利。史河冬季枯水时期,流量较小,一般的只有几个流量,在此期间,便于围坝合龙和基
(I) Features and methods of construction The Meishan Reservoir project is mainly composed of reinforced concrete structure continuous arch dams. During the construction process, a certain flow rate is allowed to overflow the dam body. The river valley near the dam site is narrow, the slopes on the two banks are steep, and the bed cover is thick. 12 ° meters, the use of tunnel diversion and a construction method, to the layout of the factory a great convenience. During the low water period of the Shihe River in winter, the flow rate was relatively small. In general, only a few flows were available. During this period, it was convenient for closing the dam and closing the dam.
其他文献
电子交换机是我国新建发展起来的一种电话交换设备.一九六八年,邮电部第一研究所和738厂合作,搞出了第一台20门船用电子交换机.一九七一年,738厂试制的200门笛簧准电子交换机
1944年3月8日,用14个月建成的波茲苏的沙拉尔水电站开始运轉,該电站命名为3月8日,因为它的建筑主要是由妇女参加的;工程中曾採取了所謂“烏茲別克方法”筑埧,即在水中填土。
国际盐矿学学术讨论会每隔四年易地开会一次。1983年5月下旬在加拿大多伦多市召开了第六届会议。地质矿产部责成我去参加此会。会议共一周,加上矿山参观、旅游,共约半个月时
我国的座标镗床制造业,在毛主席、共产党的英明领导下,仅仅十几年的功夫,就达到资本主义国家几十年才能走过的漫长路程,发展速度是很快的,成绩是巨大的。但是,也应该看到:随
【瑞士《原子能协会通报》1984年第1期报道】通过增加核能防止大气污染。这是欧洲议会环境委员会在最近召开的一次关于酸雨辩论会上提出的建议。这项建议是荷兰社会党人赫莫
(二) 機器製造业在第五個五年計劃中最重要的任務 共產黨第十九次代表大會在關於蘇联發展的第五個五年計劃的指示中,規定了國民經济一切部門新的强大的高漲,工業建設的更廣
一导言随着新中国经济建设事业的飞跃发展,焊接工作在机械契造修理和装配的过程当中,已经获得了更大限度的广泛应用。随着电焊条消费数量的增加,和对其质量要求的提高,已经
一最近曾读到了大连建新公司钢铁厂李振南同志的「粉末冶金碳化钨硬质合金刀的制造」论文,该文虽然着重在粉末冶金方面的操作纪录,然而也简明地叙述了该厂的生产经过。建新
回家的女儿 我仔细思索了一下我昨晚说的话,可有词不达意、欲盖弥彰的地方。 临近中午我是躺在床上接她从外地打来的电话的,她说,妈,你好点了没?我一会就到你那里。本来我像是缺水的、蔫了很久的,这回听了她的话,像是叶子马上立起来的苔菜,活回来了,嘴里却说,别回来呀,你千万别回来。心里却转动心思,赶紧到火车站去接她。 我想起我妈妈,除非她病到不能下床,否则她一定会和爸爸一起摇摇晃晃挣扎着到医院,再除
为布尔什维克党所鼓舞的全体苏联人民正在进行着伟大的共产主义建设工程。在伏尔加、德聂泊和阿姆河上修建庞大的水电站、拦河坝、船闸、运河和灌溉系统的工程使苏联各科学