某发电厂一台125MW锅炉2011年3月20日零点运行中突发水冷壁泄漏事故。3月20日1:57泄漏增大,锅炉负压灭火,机组转入临修。该台1 25MW机组锅炉型号为SG400/140-M412型,额定蒸发量400t/h,过热蒸汽压力13.7MPa,过热蒸汽温度535℃,再热蒸汽温度540℃。机组于1979年3月投产,至事故发生时,锅炉累计运行时间已超过20万h。经对水冷壁进行全面检查。发现水冷壁管出现多处泄漏,并伴有较大面积的鼓包情况。发生腐蚀泄漏及鼓包的管子分布较散,其中炉前墙有22根、炉后墙有22根、左侧墙有22根、右侧墙有23根,共计89根水冷壁管向火面均发现存在大量鼓包,管壁多处泄漏,泄漏点呈圆孔状,直径约5mm。如图1所示。
A 125MW Boiler in a Power Plant March 20, 2011 Sudden Occurrence of Water Wall Leakage during Zero Operation. At 1:57 on March 20 increased leakage, the boiler vacuum extinguishing, the unit into temporary repair. The 1 25MW unit boiler model SG400 / 140-M412, rated evaporation 400t / h, superheated steam pressure 13.7MPa, superheated steam temperature 535 ℃, reheat steam temperature 540 ℃. The unit was put into operation in March 1979, when the accident occurred, the total operation time of the boiler had exceeded 200,000 h. After the water wall to conduct a comprehensive inspection. Found that there were multiple water wall tube leakage, and accompanied by a larger area of the bulge situation. There were 22 pipes in front of the furnace wall, 22 in the furnace back wall, 22 in the left side wall and 23 in the right side wall, with a total of 89 water-cooled wall tubes facing the fire surface Found that there are a large number of drum kits, multiple leaks wall, the leak was circular hole diameter of about 5mm. As shown in Figure 1.