匈牙利模拟VVER-440失水事故的试验环路

来源 :国外核新闻 | 被引量 : 0次 | 上传用户:ppg1234
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
【英国《国际核工程》1983年8月号第45页报道】核动力对于匈牙利来说是比较新的东西。它的第一座核电站(波克什-1,4万千瓦苏式压水堆)不久前刚刚开始运行。即使匈牙利在核发电方面刚刚起步,但它还是希望深入地、独立地进行核安全研究工作,形成自己核电站运行的基础。作为这项工作的一部分,匈制订了关于新的 PMK 试验环路的实验计划(该 PMK 试验环路正在匈牙利中央物理研究所建造)。建造 PMK 环路的主要目的是研究小破裂失水 [United Kingdom “International Nuclear Engineering” August 1983, p. 45] Nuclear power is relatively new for Hungary. Its first nuclear power plant (Pocke-1, 40 MW WA type pressurized water reactor) has just started operation. Even if Hungary has just started in nuclear power generation, it still hopes to carry out nuclear safety research work in depth and independently and form the basis for the operation of its nuclear power plant. As part of this work, Hungary has developed an experimental plan for the new PMK test loop (which is being built at the Central Institute of Physics in Hungary). The main purpose of building the PMK loop is to study the small water loss
其他文献
在党中央“中央工业和地方工业同时并举,大、中、小企业同时并举”的方针下,各地都以“遍地开花,星罗棋布”的精神大力发展地方工业。为了更多、更快、更好、更省地进行建设
1959年是我国电机工业飞跃发展的一年,电站设备生产任务将比今年剧增10倍以上。这一任务有一半以上要靠新建厂来完成;而这些新建厂目前只有一部分已动土兴建,绝大部分的厂址
美国陆军制造工艺办公室代理主任、陆军制造方法与工艺(MMT)计划负责人F.J.米歇尔在1981年召开的数控协会国际技术会议上介绍了美国陆军加强工艺科研和1981财年科研项目的概
美国从七十年代初开始研制用于工业生产的离心机以来,已研制成功三代离心机。第一代和第二代离心机已用于离心浓缩铀试验工厂和示范工厂,第三代离心机将用来装备正在建造的
朱连兴包工队是一九五三年发展起来的。全队现有三十人,胶轮车十四辆,木轮车四辆,一盘硪,两个拉钩,两个做饭的。先后包过六次工,做了九十五天工,工程质量合规定,效率超过一
北淝河指挥所于今春工程中推行施工计划管理,采取了一般号召重点试行的方针。从全部工程来看,在缺乏经验的情况下,虽然未能在各个工程上都贯彻了计划管理;但计划管理的影响
为了查明在今后25年间铜工业的发展情况,最近美国矿产局组织了一次调查研究。他们把铜工业分解为勘探、开采、选矿、冶炼、精炼和废铜回收六个方面,并委托一个矿业公司进行
代瑙工业公司是挪威最大的工业康采恩之一,1981年的营业额约为20亿挪威克朗。该公司包括挪威国内外的20多家分公司,雇员总数约为3000人。其火炸药分公司是挪威唯一生产火炸
我局一九五四年的统计工作,是根据黄河水利委员会统计会议的精神,本「需要与可能」的原则布置的。半年来由于上级正确领导,各级干部积极努力,基本上完成了统计工作任务,并获
黄台山石料厂在一九四九年就开始推行了计件工资制度。首先在开采和推车工人中试行,取得经验后又逐渐在全厂各主要生产工种中推广。但在刚推行计件工资时,因政策水平不高,经