一、“七五”基本经验和主要问题“七五”期间,探矿战线的12万职工,在钻探任务大量下降,找矿难度日趋增加等困难条件下,出色完成了钻、坑探计划工作量,还承揽了大量市政建设和港口、码头、隧道等基础工程,完成了许多水文水井、工程勘察和工程施工钻探工作量,1989年创收3.2亿元(毛收入),为面向社会,搞活经济,稳定队伍,不断发展闯出了新路,成为地矿部门对外创收的主力军,并为地矿系统开拓地质市场,发展延伸产业奠定了稳固的基础.“七五”的基本经验是:
I. Basic Experience and Major Issues during the “Seventh Five-Year Plan” Period During the “Seventh Five-Year Plan” period, the 120,000 employees on the prospecting front completed drilling and pit planning work well under difficult conditions such as a large number of drilling missions and increasingly difficult ore-finding. It also contracted a large number of municipal projects and basic projects such as ports, docks, tunnels, etc., completed a large number of hydrological wells, engineering surveys, and engineering construction drilling workloads. In 1989, it generated revenue of 320 million yuan (gross income) for the society and invigorated the economy. Stabilizing the team and continuously developing new roads have become the main force for the external revenue generation of the geo-mineral sector, and have laid a solid foundation for the geological system to develop the geological market and develop the extended industries. The basic experience of the “7th Five-Year Plan” is: