摘要:深基坑工程具有大深度、大开挖面积等特点,从而给支撑系统带来较大难度;在软弱土层中开挖还会产生较大的位移和沉降,对周围建筑物、市政设施和地下管线造成影响;由于施工工期长、场地狭窄,降雨、重物堆放等对基坑稳定性也会产生不利影响,因此,在具体的深基坑工程施工工程中,需要在合理规划设计的基础上,结合各个工程的具体情况,采用相应的施工技术,确保安全、按期、优质的完成工程范围内的各项工程。
关键词:深基坑;开挖技术;施工技术
Abstract: the deep foundation pit engineering with deep, large area excavation, etc, thus to support system to bring greater difficulty; In the soft soil layer in the excavation will produce larger displacement and the settlement of surrounding buildings, municipal facilities and affect underground pipeline; Because construction period long, narrow space, rain, heavy piled up on the foundation pit stability also will produce adverse effect, therefore, in specific of deep foundation pit engineering construction engineering, the reasonable planning and design of need in basis, combining with the specific situation of each project, using relevant construction technology, to ensure safety on schedule, quality, complete project within the scope of the engineering.
Keywords: deep foundation pit; Excavation technology; Construction technology
中图分类号: TV551.4+2文献标识码:A文章编号:
随着社会的进步及建筑行业的发展,城市高楼林立,楼层越来越高;根基由几米变成了几十米。这些地下空间的建设,多采用费用低廉、施工方便的明挖法,由此而产生了大量深基坑工程,其规模和深度不断加大,且城市基坑工程往往处于房屋和生命线工程的密集地区。如果对深基坑开挖组织不好,定会给人们的生命财产带来威胁。随着各大城市高楼的不断增多,因深基坑开挖造成的事故越来越多。所以,加强对深基坑的研究和探讨十分必要。
1. 做好施工前的分析与准备
1.1了解深基坑开挖的设计方案
深基坑开挖的重要依据就是设计方案。可以说设计方案是施工安全的重要技术保证。设计方案是深基坑技术专家根据实现情况而制定的,有很高的技术含量。不论是从强度控制设计到变形控制设计,还是从基坑围护结构设计,其目的:一是保证基坑稳定,二是减少对周围环境的影响,三是确保施工安全可靠。要实现这些目的就要吃透设计方案,做到心中有数。分析出设计方案的重点和难点,把握在施工中的关键部位和环节。
1.2要了解深基坑的水文地质特性
对深基坑水文地质的了解和掌握,不单是设计人员的事,作为施工单位的领导和员工都应掌握。因为水文影响施工的质量和效率,影响施工组织和管理,影响施工技术的运用和事故预防。中国地大物博,东西南北水文地质差别很大,在南方施工与在北方施工大不一样。在水位上,南方水位浅,北方水位深。在土质上除有地域差别外,同一样地域也有所不同:靠江海湖泊更不用说了。如:有的地层上部以粘性土为主,下部以砂、砾石层为主,自上而下可划分为杂填土、可塑状粘土、淤泥质粉质粘土、可塑一硬塑状粘土、软塑状粉质粘土、粉砂或粉土夹软塑状粉质粘土、粉细砂、细砂、中粗砂、砾砂、碎石土等。有的地区深基坑开挖的地质容易出现基坑边坡滑移、基坑涌水、流砂及其引起的地面沉陷、基坑井点降水引起的地面沉降、道路开裂、房屋开裂等。只有对深基坑的水文地质掌握了,才能在具体施工中做到临危不惧,举措得当。
1.3要了解深基坑的环境状况
深基坑开挖的事故中,除了施工单位内部因组织、技术和管理不力造成的事故外,主要是深基坑开挖时对周围环境缺乏了解研究而造成的事故。例如在南方某工程因深基坑开挖造成的事故就足以说明了对深基坑环境状况了解的重要性。这个工程基坑面积仅6.0×6.0m2,但基坑的開挖深度达到8.4m深,且整个设备基础基坑在厂房内施工。厂房建筑为已建单层钢筋混凝土排架结构,层高为l0m,基础为天然地基独立基础。基坑边缘距离最近的两个排架柱边为6m左右,排架基础为5.2m×5.2m的矩形独立基础,基础埋深为室内地坪以下1.5m,基坑边缘距离厂房排架柱基础边的距离仅3m左右。因此该基坑虽小,但在开挖过程中的位移影响将涉及到整个厂房的使用和安全。这起基坑事故的发生主要是由于业主和施工单位未足够重视,对这种深小基坑纯粹抱着一种侥幸心理。既没有对工程水文地质进行很好化验,也没有对厂房、设备等特殊环境引起重视,因围扩不力而造成事故发生。据后来化验情况地质条件不适合所采用的施工围护方法。
2. 选择合理的施工方法
深基坑开挖的施工方法很多,较合理方法是:
(1)根据基坑工程设计所选定的主要施工参数,按基坑规模、几何尺寸、支撑形式、开挖深度和地基加固条件,提出详细的可操作的开挖与支撑的施工程序及施工参数。按分层、分步、对称、平衡的原则制定开挖与支撑的施工工序和施工参数。最主要的施工参数是分层开挖的层数、每层开挖深度,以及每层开挖中基坑挡墙被动区土体开挖后、挡墙未支撑前的暴露时间和暴露的宽度及高度。大面积不规则形状的高层建筑深基坑中,基坑挡墙被动区土体在基坑中间部分地层先开挖的过程中,被保留成支承挡墙的土堤,此土堤断面尺寸按其能抵住挡墙的要求而定,亦为主要设计参数。
(2)严格按选定的施工程序和施工参数施工,就使复杂多变的施工因素变为较明确而有规律性的施工因素,其引发的时空效应也能较符合设计预期的要求。如在不规则的大型高层建筑地下室的基坑施工中,采用分层盆式开挖法,在每一层先挖中间部分并安装或浇筑此范围的支撑,而后将各根支撑两端所留支承挡墙的土提,分步、对称地挖除并即安装或浇筑其间顶住挡墙的部份支撑。每个分步的开挖和支撑施工时间,根据支撑形式等具体情况,具有明确的控制值。各种形式的基坑均优先考虑以井点降水法改善土性,减小土的流变变形。
3. 深基坑特殊情况的处理
3.1深基坑支护综合处理
所谓基坑支护综合处理就是根据基础各部位开挖深度的不同,采取了不同的临时支顶斜撑和加强被动区措施,同时采用挖土卸荷、轻型井点降水及回灌等技术,达到了施工周期短、投资少和保证基坑及周边建筑安全的目的。在深基坑支护处理时需要掌握以下原则:一是尽量保留原有支扩桩,使其充分发挥作用,以节约投资。二是确保基坑支护结构在基础施工过程中安全可靠。三是避免因基坑周围土体变形和降水不当,造成邻近建筑、道路和地下管线的不均匀沉降。四是便于施工操作。依据这些原则,科学合理地确定基坑支护综合处理方案。即采用外围土体卸荷、对不同的开挖深度采取不同的支顶斜撑和不同的承台胎模的作法;降水采用轻型井点和回灌的措施。
3.2深基坑施工中的地下水处理
深基坑开挖一要保持基坑干燥状态,二要确保边坡稳定,否则轻则影响施工进度,重则容易酿成事故。如有的基坑积水或土质稀软,工人难以立足,无法施工;有的出现“流砂现象”导致边坡塌方,地质破坏;有的内部基坑土体发生较大的位移,影响邻近建筑物的安全。所以,在基坑施工中应对地下水的处理给予应有的重视。
常见的处理方法:一是止水法,即通过有效手段,在基坑周围形成止水帷幕,将地下水止于基坑之外,如沉井法、灌浆法、地下连续墙等;二是排水法,即将基坑范围内地表水与地下水排除,如明沟排水、井点降水等。在实现施工中止水法相对来说成本较高,施工难度较大;井点降水施工简便、操作技术易于掌握,是一种行之有效的现代化施工方法,已广泛应用。井点降水优点是:它是在拟建工程的基坑周围设可以渗水的井点管,配置一定的抽水设备,不间断地将地下水抽走,使基坑范围内的地下水降低至设计深度。井点法防水适用于具有不同几何形状的基坑,它有克服流砂、稳定边坡的作用。由于基坑内土方干燥,有利机械化施工,缩短工期,保证工程质量与安全。井点降水法有轻型井点、喷射井点、电渗井点。
4. 结束语
对深基坑开挖施工方法的研究,可以说方法很多,深浅不一。但都要做好深基坑开挖的前期准备、施工方法和特殊问题的处理等方面的工作。只有这样才能确保施工安全,提高工程质量,缩短施工时间,减少成本投入,实现经济营利。
关键词:深基坑;开挖技术;施工技术
Abstract: the deep foundation pit engineering with deep, large area excavation, etc, thus to support system to bring greater difficulty; In the soft soil layer in the excavation will produce larger displacement and the settlement of surrounding buildings, municipal facilities and affect underground pipeline; Because construction period long, narrow space, rain, heavy piled up on the foundation pit stability also will produce adverse effect, therefore, in specific of deep foundation pit engineering construction engineering, the reasonable planning and design of need in basis, combining with the specific situation of each project, using relevant construction technology, to ensure safety on schedule, quality, complete project within the scope of the engineering.
Keywords: deep foundation pit; Excavation technology; Construction technology
中图分类号: TV551.4+2文献标识码:A文章编号:
随着社会的进步及建筑行业的发展,城市高楼林立,楼层越来越高;根基由几米变成了几十米。这些地下空间的建设,多采用费用低廉、施工方便的明挖法,由此而产生了大量深基坑工程,其规模和深度不断加大,且城市基坑工程往往处于房屋和生命线工程的密集地区。如果对深基坑开挖组织不好,定会给人们的生命财产带来威胁。随着各大城市高楼的不断增多,因深基坑开挖造成的事故越来越多。所以,加强对深基坑的研究和探讨十分必要。
1. 做好施工前的分析与准备
1.1了解深基坑开挖的设计方案
深基坑开挖的重要依据就是设计方案。可以说设计方案是施工安全的重要技术保证。设计方案是深基坑技术专家根据实现情况而制定的,有很高的技术含量。不论是从强度控制设计到变形控制设计,还是从基坑围护结构设计,其目的:一是保证基坑稳定,二是减少对周围环境的影响,三是确保施工安全可靠。要实现这些目的就要吃透设计方案,做到心中有数。分析出设计方案的重点和难点,把握在施工中的关键部位和环节。
1.2要了解深基坑的水文地质特性
对深基坑水文地质的了解和掌握,不单是设计人员的事,作为施工单位的领导和员工都应掌握。因为水文影响施工的质量和效率,影响施工组织和管理,影响施工技术的运用和事故预防。中国地大物博,东西南北水文地质差别很大,在南方施工与在北方施工大不一样。在水位上,南方水位浅,北方水位深。在土质上除有地域差别外,同一样地域也有所不同:靠江海湖泊更不用说了。如:有的地层上部以粘性土为主,下部以砂、砾石层为主,自上而下可划分为杂填土、可塑状粘土、淤泥质粉质粘土、可塑一硬塑状粘土、软塑状粉质粘土、粉砂或粉土夹软塑状粉质粘土、粉细砂、细砂、中粗砂、砾砂、碎石土等。有的地区深基坑开挖的地质容易出现基坑边坡滑移、基坑涌水、流砂及其引起的地面沉陷、基坑井点降水引起的地面沉降、道路开裂、房屋开裂等。只有对深基坑的水文地质掌握了,才能在具体施工中做到临危不惧,举措得当。
1.3要了解深基坑的环境状况
深基坑开挖的事故中,除了施工单位内部因组织、技术和管理不力造成的事故外,主要是深基坑开挖时对周围环境缺乏了解研究而造成的事故。例如在南方某工程因深基坑开挖造成的事故就足以说明了对深基坑环境状况了解的重要性。这个工程基坑面积仅6.0×6.0m2,但基坑的開挖深度达到8.4m深,且整个设备基础基坑在厂房内施工。厂房建筑为已建单层钢筋混凝土排架结构,层高为l0m,基础为天然地基独立基础。基坑边缘距离最近的两个排架柱边为6m左右,排架基础为5.2m×5.2m的矩形独立基础,基础埋深为室内地坪以下1.5m,基坑边缘距离厂房排架柱基础边的距离仅3m左右。因此该基坑虽小,但在开挖过程中的位移影响将涉及到整个厂房的使用和安全。这起基坑事故的发生主要是由于业主和施工单位未足够重视,对这种深小基坑纯粹抱着一种侥幸心理。既没有对工程水文地质进行很好化验,也没有对厂房、设备等特殊环境引起重视,因围扩不力而造成事故发生。据后来化验情况地质条件不适合所采用的施工围护方法。
2. 选择合理的施工方法
深基坑开挖的施工方法很多,较合理方法是:
(1)根据基坑工程设计所选定的主要施工参数,按基坑规模、几何尺寸、支撑形式、开挖深度和地基加固条件,提出详细的可操作的开挖与支撑的施工程序及施工参数。按分层、分步、对称、平衡的原则制定开挖与支撑的施工工序和施工参数。最主要的施工参数是分层开挖的层数、每层开挖深度,以及每层开挖中基坑挡墙被动区土体开挖后、挡墙未支撑前的暴露时间和暴露的宽度及高度。大面积不规则形状的高层建筑深基坑中,基坑挡墙被动区土体在基坑中间部分地层先开挖的过程中,被保留成支承挡墙的土堤,此土堤断面尺寸按其能抵住挡墙的要求而定,亦为主要设计参数。
(2)严格按选定的施工程序和施工参数施工,就使复杂多变的施工因素变为较明确而有规律性的施工因素,其引发的时空效应也能较符合设计预期的要求。如在不规则的大型高层建筑地下室的基坑施工中,采用分层盆式开挖法,在每一层先挖中间部分并安装或浇筑此范围的支撑,而后将各根支撑两端所留支承挡墙的土提,分步、对称地挖除并即安装或浇筑其间顶住挡墙的部份支撑。每个分步的开挖和支撑施工时间,根据支撑形式等具体情况,具有明确的控制值。各种形式的基坑均优先考虑以井点降水法改善土性,减小土的流变变形。
3. 深基坑特殊情况的处理
3.1深基坑支护综合处理
所谓基坑支护综合处理就是根据基础各部位开挖深度的不同,采取了不同的临时支顶斜撑和加强被动区措施,同时采用挖土卸荷、轻型井点降水及回灌等技术,达到了施工周期短、投资少和保证基坑及周边建筑安全的目的。在深基坑支护处理时需要掌握以下原则:一是尽量保留原有支扩桩,使其充分发挥作用,以节约投资。二是确保基坑支护结构在基础施工过程中安全可靠。三是避免因基坑周围土体变形和降水不当,造成邻近建筑、道路和地下管线的不均匀沉降。四是便于施工操作。依据这些原则,科学合理地确定基坑支护综合处理方案。即采用外围土体卸荷、对不同的开挖深度采取不同的支顶斜撑和不同的承台胎模的作法;降水采用轻型井点和回灌的措施。
3.2深基坑施工中的地下水处理
深基坑开挖一要保持基坑干燥状态,二要确保边坡稳定,否则轻则影响施工进度,重则容易酿成事故。如有的基坑积水或土质稀软,工人难以立足,无法施工;有的出现“流砂现象”导致边坡塌方,地质破坏;有的内部基坑土体发生较大的位移,影响邻近建筑物的安全。所以,在基坑施工中应对地下水的处理给予应有的重视。
常见的处理方法:一是止水法,即通过有效手段,在基坑周围形成止水帷幕,将地下水止于基坑之外,如沉井法、灌浆法、地下连续墙等;二是排水法,即将基坑范围内地表水与地下水排除,如明沟排水、井点降水等。在实现施工中止水法相对来说成本较高,施工难度较大;井点降水施工简便、操作技术易于掌握,是一种行之有效的现代化施工方法,已广泛应用。井点降水优点是:它是在拟建工程的基坑周围设可以渗水的井点管,配置一定的抽水设备,不间断地将地下水抽走,使基坑范围内的地下水降低至设计深度。井点法防水适用于具有不同几何形状的基坑,它有克服流砂、稳定边坡的作用。由于基坑内土方干燥,有利机械化施工,缩短工期,保证工程质量与安全。井点降水法有轻型井点、喷射井点、电渗井点。
4. 结束语
对深基坑开挖施工方法的研究,可以说方法很多,深浅不一。但都要做好深基坑开挖的前期准备、施工方法和特殊问题的处理等方面的工作。只有这样才能确保施工安全,提高工程质量,缩短施工时间,减少成本投入,实现经济营利。