平原因河势水情复杂,布置工作困难,每年防汛,都感觉到问题的严重,今天听到各首长的指示,更增加了不少的勇气。我现在向大会报告以下两个问题:一、工程准备情况:甲、复堤工程:今年春工总的情况是任务大,条件不好,复堤土方计划六百一十三万公方,这个任务很大,因为临堤积水,取土距离远,去年遭受水灾,劳动力不够,这些条件不好,所以
Due to the complicated river regime and the difficult layout of work and the flood control each year, all of them feel the seriousness of the problem. Today, I heard a lot of courage from various heads of government. I now report to the General Assembly the following two questions: I. Project preparation: A, the project of reclamation: the general situation of spring workers this year is a big task and the conditions are not good. The embankment earthwork plans 6.133 million square meters. This The task is very large, because the embankment water, take a long distance from the soil, last year suffered floods, labor is not enough, these conditions are not good, so