A 40 keV test line for pulsed beam generation is being constructed at China Institute of Atomic Energy (CIAE), injecting into the 10 MeV Central Region Model (C
Phase probe system is an important part of the cyclotron beam diagnostic systems. Inside the cyclotron, the beam has to be in phase with RF. Because of the mech
1 Introduction Four superconducting QWR cavities will be used in HI-13 tandem accelerator upgrade project (BRIF). These niobium coated cavities will be produced
The optical potential parameter is one of the most important quantities, which is closely related to the internal structure of the colliding nuclei. 6He is a we