1.施工准备阶段(1)技术方面的准备如下。1)图纸会审,施工设计图纸中避雷针的材料、规格、型号与规范是否一致,图纸设计平面图、剖面图是否满足施工要求;2)施工技术交底应根据工程的实际情况,编制施工技术交底的内容,施工作业人员通过内容可清晰知晓实际操作要点,施工作业人员须参加技术交底并形成书面记录。(2)施工机具准备。根据避雷针施工要求合理配备施工机具,根据避雷针吊装高
1. Construction preparation phase (1) The technical preparation is as follows. 1) Whether the materials, specifications, models and specifications of the lightning rod in the blueprint meeting and construction design drawings are consistent or not, and whether the plan and drawing of the blueprint design meet the construction requirements; 2) The construction technology shall be submitted according to the actual conditions of the project , Construction workers through the content can be clearly aware of the actual operation of key points, construction workers to participate in technical writing and to form a written record. (2) construction equipment preparation. According to the lightning rod construction requirements reasonable construction equipment, according to the lightning rod lifting high