论文部分内容阅读
吐哈油田公司科研人员解放思想,勇挑重任,努力试验新技术,探索创新开发技术,促进了鲁克沁和三塘湖有效开发。上半年,勘探开发研究院提交设计的鲁克沁和三塘湖的井位,完钻油井78口,投产67口,初期产能360.7t/d。鲁克沁稠油是2012年吐哈油田产能建设的主战场,在建设“新疆大庆”工程中具有举足轻重的地位。科研人员在鲁克沁设计并开展了多项矿场试验,通过研究与试验,为稠油持续开展产能建设、油田稳产提供了强有3
Turpan-Hami Oilfield Company researchers emancipate their minds, brave challenges, and strive to test new technologies, explore innovative development technology, and promote the effective development of Lukqin and Santang Lake. In the first half of the year, the Research Institute of Exploration, Development and Design submitted the designed well positions of Lukqin and Santanghu, finished 78 wells and put into operation 67 with an initial capacity of 360.7t / d. The heavy oil in Luqqin is the main battlefield for the capacity building of Turpan-Hami Oilfield in 2012 and plays a decisive role in the construction of “Daqing, Xinjiang” project. Researchers in Luqin Qin designed and conducted a number of field tests, through research and testing, for heavy oil continued capacity-building, oil production and provide a strong 3