新太县西周河渡槽全长877米,除槽身拉杆、侧墙与底板拼缝处和主拱圈隔板布置有钢筋外,其余均系素混凝土,设计流量6.9米~3/秒,1978年施工完成,经过三年多运行,并受多次6~8级大风考验,完整无损。渡槽每孔净跨20米,主拱圈为双曲拱形式,矢跨比1/6,主拱圈上设有4个素混凝土排架柱,柱距4.24米,排架柱上设有5节矩形素混凝土槽身,槽身底板为1/10矢跨比的微弯板,两侧槽板与槽身底板分开预制,现场拼装,节约了大量三材
Xintai County, the Western Zhou River aqueduct length of 877 meters, with the exception of the body tie rod, the side wall and the floor patchwork and the main arch diaphragm arranged with reinforcement, the rest are all plain concrete, design flow 6.9 m ~ 3 / s, 1978 Year construction is completed, after more than three years of operation, and by many 6 to 8 wind tests, intact. Aqueduct each hole 20 meters wide, the main arch for the double arch form, pitch than 1/6, the main arch ring is provided with 4 plain concrete column, column spacing 4.24 meters, with 5 Section rectangular concrete tank body, the tank floor for 1/10 sag ratio of micro-bending plate, both sides of the groove plate and the tank floor prefabricated, field assembly, saving a lot of three timber