深圳市勤诚达C区项目,西侧紧邻地铁5号线,由于地铁对基坑安全要求高,西侧的基坑设计为三排桩支护;东侧距离灵芝小学仅隔一条6 m宽市政道路,基坑的东、西两侧设计均预留有土台;3栋塔楼的核心筒承台区域,在裙楼基坑的基础上,还需向下开挖深度超过4.1~5 m,即“坑中坑”;由于本工程的基坑土质情况为黏性土或强风化岩,初期强度较高,遇水软化;包括本工程的出土坡道,由于无足够的放坡距离,均需采取二次支护措施;本文就如何利用微型桩技术解决“土台”“坑中坑”“出土坡道”支护施工中的技术问题提供参考。
Qincheng District, Shenzhen C area project, close to the west side of Metro Line 5, due to the subway on the safety requirements of the pit, the west side of the pit design for the three rows of piles support; east of Lingzhi primary school only separated by a 6 m wide Municipal roads, the design of the foundation pit on both the east and west sides are reserved for earth stations. In the core area of the three towers, excavation depth of more than 4.1 ~ 5 m is required on the basis of plinth foundation pits. That is, “pit in the pit”. Since the soil quality of the foundation pit in this project is clay or strong weathered rock, the initial strength is higher and softens with water. Including the unearthed ramp of this project, since there is not enough grading distance , All of them need to take secondary support measures. In this paper, how to use micro-pile technology to solve the technical problems in the construction of “pit”, “pit”, “unearthed ram” support.