沙角电厂C厂煤码头圆筒加载预压观测

来源 :华南港工 | 被引量 : 0次 | 上传用户:mydoself
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
一、工程概况沙角电厂 C 厂煤码头位于东莞虎门沙角,在现有 B 电厂码头的东侧,由连接岸上的约1500m 长的引桥延伸至主航道,形成倒 L 型平面布置,见图1。该码头由英国奥雅纳工程顾问设计,交通部四航局一公司施工。卸煤码头下部结构为重力式圆筒支墩,上部结构为整体式梁板结构。码头面长297m,宽25m,顶面标高为+5.5m(珠江基准面,下同)。码头前沿设计水深为-14m。在码头的 I. Project Overview The coal terminal of Shajiao Power Plant Plant C is located at Shajiao, Humen, Dongguan. It extends eastward from the existing B power station terminal by about 1500m long approach bridge connecting the shore to the main waterway, forming an inverted L-shaped plan. 1. The pier designed by the British Arup engineering consultants, four companies of the Ministry of Transportation construction of a company. The lower structure of the unloading terminal is a gravity cylindrical support pier, and the upper structure is an integral beam structure. The pier face is 297m long and 25m wide. The top elevation is + 5.5m (Pearl River datum, the same below). Marina front design depth of -14m. At the dock
其他文献
成都画凋中国画届口口口上、刘朴 俄尔雅风情 58×68cm下、博森年 新绿 88×80cm朱常棣金龙潭133×96cm巫成金悠悠羌情160x 78cm朱佩君荷花鲤鱼67×65cm成都画派中国画展作品
本文指出,改进节点法中存在电流变量支路的割集时避免零主元的一个充分必要条件,并据此给出了一个选主元的算法。 This paper points out that a sufficient and necessary