论文部分内容阅读
人民银行县支行的计算机机房多建成于80年代末至90年代初,由于年久失修、线路老化、网络布线混乱,其升级改造已势在必行。设计目标与标准机房的升级改造设计应安全、环保、实用,机房在改造升级过程中,应严格遵照以下标准:《电子计算机机房设计规范 GB 5014-93》《供配电系统设计规范 GB 50052-95》《EIA/TIA-606商务建筑布线标准》《银行系统计算机机房安全技术规范》
The computer room of the PBC branch was built in the late 1980s and early 1990s. Due to the disrepair, the aging of the lines and the chaotic network layout, the upgrade of the computer labs is imperative. Design goals and standard room upgrade design should be safe, environmentally friendly and practical, the engine room in the process of transformation and upgrading should be in strict accordance with the following standards: “computer room design specifications GB 5014-93” for power distribution system design specifications GB 50052- 95 “” EIA / TIA-606 Commercial Building Wiring Standards “” Computer System Security Technical Specification Bank System "