小浪底水利枢纽工程位于洛阳以北黄河中游最后一段峡谷的出口处,上距三门峡水利枢纽130公里,下距郑州花园口128公里,是黄河干流三门峡以下唯一能够取得较大库容的控制性工程。 小浪底工程坝址控制流域面积69.4万平方公里,占黄河流域面积的92.3%,水库总容积126.5亿立方米,长期有效库容51亿立方米。小浪底水利枢纽的开发目标是:以防洪、防凌、减淤为主,兼顾供水、灌溉和发电。工程建成后
Xiaolangdi Hydro Project is located at the exit of the last section of the middle reaches of the Yellow River in north of Luoyang. It is 130 km away from Sanmenxia Water Control Project and 128 km away from Huayuankou, Zhengzhou City. It is the only control project capable of obtaining larger storage capacity under the Sanmenxia River in the mainstream of the Yellow River. Xiaolangdi dam site control basin area of 694000 square kilometers, accounting for 92.3% of the Yellow River basin area, the total reservoir volume of 12650000000 cubic meters, long-term effective storage capacity of 5100000000 cubic meters. Xiaolangdi hydro project development goals are: to flood control, anti-Ling, reducing silt mainly take into account water supply, irrigation and power generation. After the project is completed