一、注意工程前期资料的收集完整的基建工程档案不仅要记录工程的施工管理,还应涵盖工程前期的资料。这部分资料主要包括:可行性的研究报告、工程立项文件、规划意见书、地质勘察报告、施工图纸、预算书等等。这些资料是基本建设档案归档的重要内容。后期形成的材料主要包括:设计变更材料。基本建设施工中,对工程局部进行变更、优化是不可避免的。凡工程变更,
First, pay attention to pre-project data collection Complete infrastructure project archives not only to record the construction management of the project, but also cover the pre-project data. This part of the information includes: feasibility study report, project approval documents, planning submissions, geological survey reports, construction drawings, budget books and so on. This information is an important part of the archives of the capital construction. Post-formed materials include: design change materials. In the construction of capital construction, it is unavoidable to make partial changes and optimization of the project. Where the project changes,